Similar Projects
Last Updated | 08/07/2019 11:41 AM |
Project Title | 2019 Traffic Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | Orem, UT 84057 (Utah County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $250,000 to $280,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes 72,600 square feet of Type III Micro Surfacing, 1055 linear feet of Type B3 Concrete Curb, 385 square feet of concrete flatwork, 495 square feet of stamped concrete flatwork, 225 linear feet of curb and gutter, 6 plowable end sections, 2 irrigation boxes, 74 linear feet of 21” RCP irrigation pipe, 4 modified ADA ramps, and striping. The engineer's estimate is for the work $250,000 to $280,000. The site of the Work is located at 2000 North (180 West to 85 West), 800 East (875 North to 700 North), Center Street (State Street to 150 East), and 400 West (900 South to 960 South). | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |