Similar Projects
South Rice Apartments
New Construction - 204,000 SF
Conception
$1,500,000 est. value
Houston, TX 77081

Vicinia
New Construction
Conception
San Antonio, TX 78251

Kyle Town Center
New Construction - 300,000 SF
Design
$10,000,000 CJ est. value
Kyle, TX 78640

Spring Valley Road Development
New Construction - 15,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Richardson, TX 75082

Development Opportunities
Bidding
El Paso, TX

Royalton at Rockwall Phase II
New Construction
Bidding by Invitation
Rockwall, TX 75032

Lakewood Crossing Apartments
New Construction
Sub-Bidding
Granbury, TX

The Apartments on Caroline
New Construction, Demolition - 90,722 SF
Sub-Bidding
$1,500,000 est. value
Houston, TX 77282

Development Opportunities
Post-Bid
El Paso, TX 79905

Altuda Arms Apartments Clubhouse
New Construction - 3,940 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
El Paso, TX 79924

Bathroom and Flooring Rehabilitation for Two Apartments
Results
Nocona, TX 76255

Refurbish Mansions at Turkey Creek Apartments
Results
Less than $175,339 est. value
Humble, TX 77338

Stacy Green
New Construction
Construction
Allen, TX 75013

Belterra
New Construction - 314,701 SF
Construction
$26,000,000 est. value
Dripping Springs, TX 78737

Tampico Lofts
New Construction
Pending Verification
San Antonio, TX 78207

Reported 02/18/2021 12:16 PM
Project Title

Gallagher Drive Apartments

Physical Address View project details and contacts
City, State (County) Sherman, TX 75090   (Grayson County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method General Contractor to Subcontract.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Apartments/Condominiums, New Construction, New Construction, 234 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents