Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

Single Asphalt Seal Coat, In-Place and Double Asphalt Seal Coat, In-Place
Infrastructure
Design
$200,000 CJ est. value
Albrightsvlle, PA 18210

Single Asphalt Seal Coat, In-Place and Double Asphalt Seal Coat, In-Place
Infrastructure
Design
$200,000 CJ est. value
Albrightsvlle, PA 18210

Stream Crossings Replacement Project
Infrastructure
Bidding
$200,000 CJ est. value
Brockway, PA 15824

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Major Bridge P3
New Construction
Post-Bid

Coder Bridge #2
Results
$2,500,000 to $4,999,999 est. value
PA

2021 Road Improvement Project
Results

Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

2022 Bituminous Paving Repairs
Term Contract, Infrastructure
Post-Bid
Reynoldsville, PA

SGL 54 Rainetown Road Improvement Project
Results
PA

Moore Bridge
Renovation
Conception
$1,301,200 est. value
Brookville, PA

Sr 1003 - Brady Twp Line To Sr 1001
Alteration
Design
$2,899,132 est. value

Last Updated 09/23/2022 08:42 AM
Project Title

I-80 North Fork Bridges Project - Pennsylvania Department of Transportation

Physical Address View project details and contacts
City, State (County) Reynoldsville, PA 15851   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2025
Bids Due View project details and contacts
Estimated Value $195,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the project is to provide safe, efficient, and effective crossings of I-80 over North Fork Redbank Creek and Water Plant Road that appropriately accommodate interstate traffic with respect to connectivity, mobility, loading and geometry. The main spans of the existing bridges are steel two-girder systems with floor beams and stringers; the bridges are fracture critical since many components of the bridges are nonredundant. Both bridges have problematic fatigue details which have received multiple retrofits during the service lives of the structures. The eastbound bridge is in poor condition and the westbound bridge is in fair condition; inspections are required on a 6-month and 1-year basis, respectively. The existing bridges are separated by approximately 1,100 feet, with the Walter Dick Memorial Park located between and below the two bridges. Both bridges are reaching the end of their serviceable lifespan. This section of I-80 has a posted speed limit of 70 miles per hour (mph) and has horizontal and vertical geometry that does not meet 70 mph design criteria. Many crashes, nearly twice the statewide average, have occurred on this segment of I-80 due to a substandard curve on the western approach to the Eastbound bridge. In addition to the replacement of the I-80 North Fork Bridges, this project will include the replacement of the I-80 Eastbound and Westbound bridges over State Route 4003 (Jenks Street), as well as the replacement of the State Route 4005 (Richardsville Road) bridges over I-80. The project will also include the extension of the North Fork Park Culvert, which carries I-80 traffic over the tributary to North Fork Redbank Creek. As of September 23, 2022, the owner entered into a pre-development agreement with Bridging Pennsylvania Partners (BPP) which is comprised of the below firms: Macquarie Infrastructure Developments LLC Shikun & Binui Concessions USA Inc; STV Incorporated FCC Construccion, S.A. Shikun & Binui – America, Inc. SAI Consulting Engineers, Inc. Wagman Heavy Civil, Inc. Joseph B. Fay Company H&K Group Inc. *All information on this project can be obtained from https://www.penndot.pa.gov/RegionalOffices/district-10/ConstructionsProjectsAndRoadwork/Pages/I-80-North-Fork.aspx

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents