Similar Projects
2022 CIPP Rehabilitation Project
Infrastructure
Bidding
Bluffdale, UT

SR-186; 2100 E. to Stringham Ave
Infrastructure
Bidding
$1,500,000 to $3,000,000 est. value
UT

SLC Airport PCC Pavement Joint Seal Program - Deicing Pad Taxiway
Post-Bid
Salt Lake City, UT

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

300 East (11400 South to 11800 South) Reconstruction Project
Results
Draper, UT 84020

2021 High Density Mineral Bond
Results
South Jordan, UT 84095

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

SR-266; I-15 To 700 E
Infrastructure
Bidding
$1,500,000 to $3,000,000 est. value
UT

Deer Ridge Drive Reconstruction
Alteration
Post-Bid
$980,000 est. value
Draper, UT

1500 South Reconstruction From Redwood Road To 2700 West
Results
Salt Lake City, UT

2022 Roadway Rehabilitation Project
Infrastructure
Bidding
Herriman, UT

City-Wide Roadway Improvement Project
Infrastructure
Post-Bid
Cottonwood Heights, UT

On-Call Transit Infrastructure Construction, Maintenance and Repair
Term Contract
Results
Less than $5,000,000 est. value
Salt Lake City, UT

5400 South and 1900 West Intersection
Infrastructure
Bidding
Less than $500,000 est. value
UT

Last Updated 03/30/2022 03:59 AM
Project Title

Zone 6 Highway Junction Reservoir 2

Physical Address View project details and contacts
City, State (County) West Jordan, UT 84088   (Salt Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,700,000 to $5,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the construction of a new 3 MG AWWA D110, Type 1, prestressed concrete reservoir; reservoir inlet, outlet, underdrain, drain, overflow, and washdown piping; connections to existing yard piping; temporary piping, electrical and SCADA connections during construction; landscaping, restoration and irrigation; electrical, instrumentation and controls; testing, disinfection, commissioning and startup. Work includes mechanical improvements to the existing Outlet Valve Vault; excavation, backfill, earthwork; asphalt access roads and asphalt restoration associated with construction of new facilities; and all other work required to complete this project as defined in the drawings and specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents