Similar Projects
Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Penn Avenue/Eastwood Drive Improvements Project
Infrastructure
Bidding
Prescott, AZ 86303

Supply and Deliver Select Material in Yavapai County
Infrastructure
Bidding
AZ

Design-Build Services for Verde Connect Road, SR 260 to Cornville Road
Post-Bid
Prescott, AZ 86305

Supply and Deliver Liquid Asphalt Products
Post-Bid
Prescott, AZ

Capacity Additions (Major Widening)
Results
Less than $8,590,000 est. value
AZ

FY 21 Slurry Seal Project
Results
Less than $1,400,000 est. value
Chino Valley, AZ

6--Aggregate Gravel #3 (2.5 - 0.5 Inch)
Term Contract
Bidding
Yuma Proving Ground, AZ

Aggregate Materials, Rip Rap and Sand
Post-Bid

Intersection Improvement
Results
Less than $1,200,000 est. value
Chino Valley, AZ

Airport Ruger Road Sewer Trunk Main Upsizing Phase 1
Infrastructure
Bidding
Prescott, AZ

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

Cottonwood Street Visibility Improvements and Willard Street Dip Repair Project
Results
Cottonwood, AZ 86326

Rest Area Rehabilitation
Renovation, Infrastructure
Bidding
$5,800,000 est. value
AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Last Updated 03/18/2022 04:07 AM
Project Title

Chip Seal (Summer, Fy 21 - 22)

Physical Address View project details and contacts
City, State (County) AZ   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,253,250
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for the placement of a CRS-2P 3/8” chip seal on existing paved roads and fog sealing of new chip sealed roads throughout Yavapai County. Total estimated quantity of area to receive a CRS-2P 3/8” chip seal is approximately 569,592 square yards. The total estimated quantity of fog seal coat is 56,959 gallons. Project locations include: Verde Village, Cottonwood, Prescott Country Club, and Williamson Valley. Re-establishing of existing paint striping and markings, where applicable, is also included in this contract and as specified on the plans.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents