Similar Projects
Southern Oaks
New Construction
Conception
Narcoossee, Saint Cloud, FL 34771

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

The Wharf
New Construction - 11,982 SF
Design
$965,056 est. value
Saint Augustine, FL 32084

Ocean Inlet Park - Marina Replacement
Bidding
Lake Worth, FL 33460

Refurbish SR 50 Airboat Ramp
Infrastructure
Bidding
$30,000 est. value
Palatka, FL

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Post-Bid
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

DeSoto Park ADA Floating Kayak Launch
Post-Bid
Satellite Beach, FL 32937

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Trout River Floating Dock Demolition
Results
Less than $56,060 est. value
Jacksonville, FL

The Harbour in Historic Coconut Grove
New Construction, Renovation - 112,200 SF
Construction
$17,900,000 est. value
Coconut Grove, FL

Seaside at Amelia Timber Handrail Remove and Replace
Infrastructure
Bidding
Less than $65,000 est. value
Fernandina Beach, FL

Removal, Derelict Marine Vessels
Post-Bid
Less than $50,000 est. value
Tampa, FL 33601

Carl Gray Park Boat Ramp Improvements
Results
$250,000 est. value
Panama City, FL

Desoto County Veterans Memorial Park Boat Ramp Construction Services Project
Infrastructure
Bidding
$1,200,000 est. value
FL

Black Point Marina - Dock Reconstruction
Post-Bid
Less than $804,000 est. value
Homestead, FL 33032

Last Updated 06/23/2021 12:49 AM
Project Title

Port of Pensacola Berths 2, 3, 5, 6 and 7 Repairs

Physical Address View project details and contacts
City, State (County) Pensacola, FL   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demo for disposal all remaining components of the existing timber cribbage fender system located along Berths 2, 3 and 5, including steel H-piles, horizontal steel walers, rubber fender units, shear and tension chains, timber walers and blocking, and all other miscellaneous items associated with the existing system. 1. Construction of new cast-in-place concrete pedestals on the waterside vertical face of Berths 2, 3 and 5 at each new Arch Fender Unit. 2. Receiving, unloading, storage, assembly and installation of owner furnished Arch Fender Units along Berths 2, 3 and 5. 3. Removal for disposal of timber cribbage fender system debris located along the eastern shoreline of the port as a result of Hurricane Sally. 4. Furnish and install new steel bar grating and handrail at the Berth 6 finger pier. Alternate 1: The Scope of Work for Additive Alternate #1 consists of the following: 1. Demo for disposal the entire north and south dolphin jacket structures at Berth 7, including full removal of the associated existing steel pipe piles. 2. Demo for disposal all remaining components of the existing timber fender system at the Berth 7 Loading Platform Structure. 3. Furnish and install six (6) new concrete filled steel pipe monopile breasting/mooring dolphins at Berth 7.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents