Similar Projects
Well No.10 Treatment Plant Upgrades
Renovation
Bidding
Seaside Park, NJ 08752

Well 2 Filter Plant Upgrades
New Construction
Bidding
Braddock, NJ

Wastewater Treatment Plant Filter and Residuals Building Improvements
Post-Bid
Clinton, NJ 08809

Spring Street and Orchard Place Arsenic Treatment System Facilities
Post-Bid
Ramsey, NJ 07446

Replacement of Reverse Osmosis (RO) Membrane Elements
Results
Keansburg, NJ

WWTP Tertiary Filter Replacement
Results
$397,000 est. value
Flanders, NJ 07836

Water Treatment Plant Upgrade, Chemical Building Expansion - Phase 2
Construction
Florence, NJ 08518

Carl J. Olsen Treatment Plant - Upgrades and New Ozone Treatment Facility
New Construction, Renovation
Construction
Edison, NJ 08817

WWTP Sludge Handling System and Emergency Pump Station Improvements
Renovation, Addition
Bidding
Long Branch, NJ 07740

Water Filtration Plant Filter Media Replacement
Post-Bid
Willingboro, NJ 08046

Wastewater Treatment Plant Unit Substation Maintenance and Testing
Results
Lincoln Park, NJ

Adams Street Wastewater Treatment Plant Preliminary Facilities Bar Screen Upgrades
Renovation
Bidding
Hoboken, NJ 07030

Water Plant Upgrades and Restoration
Post-Bid
Galloway, NJ 08205

Peracetic Acid Chemical Feed System
Results
Mount Holly, NJ 08060

Plant Infrastructure Repairs
New Construction, Term Contract
Bidding
West Paterson, NJ

Last Updated 06/25/2021 02:41 PM
Project Title

2019 Reconstruction of Facilities at the Ship Bottom Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Ship Bottom, NJ 08008   (Ocean County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method
Project Status Construction Commenced September 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a new complete water plant including filters, pumps, chlorine and lime rooms and support platform, contact tank; and demolish existing water plant and site restoration.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents