Similar Projects
Last Updated | 07/20/2023 03:02 PM |
Project Title | New Gretna Middle School #3 - Bid Package #3 |
Physical Address | View project details and contacts |
City, State (County) | Richland Viii, NE 68028 (Sarpy County) |
Category(s) | Education, Entertainment/Recreation, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Athletic Facility, Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Selection Underway, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $65,000,000 [brand] Estimate |
Plans Available from | Construction Manager - 03/06/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bid Package #3 1. 062023.13 - Stage Floor Construction 2. 072119 - Foamed-In-Place Insulation 3. 072726 - Fluid Applied Air Barrier 4. 083313 - Coiling Counter Doors 5. 083323 - Overhead Coiling Doors 6. 083613 - Sectional Doors 7. 054000, 061600, 072100, 072417, 072419, 072500, 092116.23, 092216, 092900, 095113, 098433, 098436 - Interior & Exterior Framing, Drywall, Ceilings, Acoustical Panels 8. 093013 - Ceramic Tiling 9. 033000 - Sealed & Hardened Concrete 10. 096466 - Wood Athletic Flooring 11. 096723 - Resinous Flooring 12. 096513, 096519, 096536, 096813 - Carpet & Resilient Flooring Package 13. 099123 & 099600 - Interior Painting & High-Performance Coatings 14. 078413, 078443, 079100, 079200, 079219 - Joint Sealants & Firestopping 15. 079513.13 Interior Expansion Joint Cover Assemblies 16. 111313 - Dock Bumpers 17. 323223 - Retaining Walls Subcontractors, at their discretion, may combine multiple bid packages into one package. All Subcontractors and Material Suppliers will be required to provide a dual obligee Payment and Performance bond, for the former, and a dual obligee Supply Bond, for the latter, listing MCL and Gretna Public Schools as obligees. No bidder shall withdraw his bid within 30 days after the actual date of the opening thereof. Bids will be evaluated based on the lowest responsible bidder which shall mean financial responsibility, the general ability and capacity of the bidder to perform the work, the bidder's facilities and suitability for the task, and those qualities which the bidder must necessarily have in order to perform the contract strictly in accordance with its terms. Time is of the essence for this project and bids will not be considered if the contractor cannot meet the construction schedule as provided. MCL reserves the right to reject any, and all bids, to waive irregularities and informalities therein, and to award the contract in the best interest of the owner. *Please note that the listed value reflects the entire scope of work. |
||||||||||||||||||||||||||||||||||||||||
Details | 160,200 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |