Similar Projects
Saratoga Springs Lake Mountain Zone 2 South Pond and Losee Canyon Debris
Bidding
Saratoga Springs, UT

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

500 East 600 South Design
Post-Bid
Salem, UT 84653

Pony Express Trench Repair
Results
Less than $1,000,000 est. value
Eagle Mountain, UT 84005

Utah County Various NRCS Emergency Watershed Protection (EWP) Projects
Results
Provo, UT 84606

The East Bay Golf Course Pond Banks Renewal Project
Post-Bid
Provo, UT 84606

Filters and Diversions Project
Results
Less than $1,002,915 est. value
Pleasant Grove, UT 84062

Knolls Fire Erosion Mitigation Project Phase 2
Post-Bid
Less than $901,255 est. value
Saratoga Springs, UT 84045

Spanish Fork MS4
Results
Spanish Fork, UT

Traverse Mountain Emergency Watershed Protection
Post-Bid
Lehi, UT 84043

Provo/Orem MS4
Results
Orem, UT 84058

Drain Cleaning and Related Services
Term Contract
Post-Bid

Spanish Fork Parkway Phase 2 Grading
Term Contract
Results
Spanish Fork, UT 84660

Lower School House Springs - Phase II
Post-Bid
Lehi, UT

Crab Creek Restoration
Results
$310,000 to $330,000 est. value
Provo, UT 84606

Last Updated 04/28/2020 03:56 PM
Project Title

Sixth Water Flow Control Structure Modification

Physical Address View project details and contacts
City, State (County) Orem, UT 84097   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction work, in general, consists of the following: Furnishing and installing a high pressure and high head break bypass flow control structure and reconstruction of an 87-inch diameter tunnel access pipeline. The project primarily includes earthwork, structural, mechanical, piping, and electrical work for a new bypass flow control structure that will be located adjacent to the existing structure. The site is constrained and located in a remote area in Sixth Water Canyon.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents