Similar Projects
Last Updated | 04/28/2020 03:56 PM |
Project Title | Sixth Water Flow Control Structure Modification |
Physical Address | View project details and contacts |
City, State (County) | Orem, UT 84097 (Utah County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The construction work, in general, consists of the following: Furnishing and installing a high pressure and high head break bypass flow control structure and reconstruction of an 87-inch diameter tunnel access pipeline. The project primarily includes earthwork, structural, mechanical, piping, and electrical work for a new bypass flow control structure that will be located adjacent to the existing structure. The site is constrained and located in a remote area in Sixth Water Canyon. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |