Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

San Souci Road Elevation Design
Infrastructure
Design
WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$130,000,000 CJ est. value
Issaquah, WA 98029

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$130,000,000 CJ est. value
Issaquah, WA 98029

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

Gridline Apartments
New Construction, Infrastructure
Construction
$66,400,000 CJ est. value
Seattle, WA 98122

Gridline Apartments
New Construction, Infrastructure
Construction
$66,400,000 CJ est. value
Seattle, WA 98122

Western Avenue Apartment Building
Demolition, New Construction, Infrastructure - 250,000 SF
Pending Verification
$56,600,000 CJ est. value
Seattle, WA 98121

Western Avenue Apartment Building
Demolition, New Construction, Infrastructure - 250,000 SF
Pending Verification
$56,600,000 CJ est. value
Seattle, WA 98121

Eastrail Trail Connection at Spring Boulevard - City of Bellevue
Infrastructure
Design
$7,500,000 CJ est. value
Bellevue, WA 98005

Last Updated 08/12/2022 02:06 PM
Project Title

Water Main Rehabiitation Package 4

Physical Address View project details and contacts
City, State (County) Seattle, WA 98164   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,249,995 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of the following elements of Work: Abandon in-place existing watermains; install new ductile iron watermain pipe, including valving, fire hydrants, and other watermain appurtenances, ranging from 6 inch to 8 inch in diameter by open-trench method: storm & sewer improvements; assist SPU Water Operations with: cut, cap, blocking of existing watermains, temporary and permanent water main connections, and temporary and permanent water services connection transfers; and final surface restoration of roadway and landscaping, including ADA. curb ramp improvements. This Project is a Covered Project subject to the City of Seattle's Community Workforce Agreement (CWA) and Priority Hire SMC 20.37. With the support of the mayor and City Council, the City of Seattle administers programs that support racial and economic equity through contracting, Priority Hire is one of these programs. Priority Hire provides people living in economically distressed communities, women, and people of color access to work on the city's construction projects No Bid will be accepted from any Bidder who does not attend at least 1 ofthe mandatory meetings This Project is located at nine different sites in Seattle and at one site in the City ofShoreline: 1) N 43rd St from Meridian Ave N to Bagley Ave N; 2) E Olive St from 31st Ave E to 32nd Ave; 3) E Spring St from 14th Ave to 16th Ave: 4) E Marion St from 14th Ave to 15th Ave; 5) E Columbia St from 14th Ave to 16th Ave; 6) 57th Ave SW from SW Stevens to SW Winthrop St; and 7) 48th Ave S from S Othello St to S Austin St; 8) S Pearl St from Corson Ave S to 12th Ave S; 9) SW 98th St from 50th Ave SW to 51st Ave SW; and 10) N 148th St from Meridian Ave N to Corliss Ave N (City of Shoreline). For purposes ofthe Inclusion Plan, this is considered a "UNDERGROUND" type of project with a Past Performance of 17% WMBE utilization rates based, on completed projects. For questions on the Inclusion Plan please contact Miguel Beltran at Miguel, beltran@seattle.gov or 206-684- 4525. Back-up contact is Carmen Kucinski at carmen.kucinski@ seattle.g.ov or 206-684-0188. Questions must be submitted no later than 5:00 p.m. 3 Business Days before the Bid Opening Date. Only written questions will be accepted for this project. Please submit your questions to Kai Fan at kai.fan(R) seatUmgov.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents