Similar Projects
Homestead Phase 4
New Construction, Infrastructure - 7,900 SF
Conception
$80,000,000 CJ est. value
Logan, UT 84321

Homestead Phase 4
New Construction, Infrastructure - 7,900 SF
Conception
$80,000,000 CJ est. value
Logan, UT 84321

Foreign-Language Center - Utah State University
New Construction, Infrastructure
Design
$14,500,000 CJ est. value
Logan, UT 84321

Logan Meadows Business Park
New Construction, Infrastructure - 83,560 SF
Design
$12,300,000 CJ est. value
Logan, UT 84321

400 South North Sidewalk - 400 East to 600 East
Infrastructure
Bidding
$360,000 CJ est. value
River Heights, UT 84321

400 South North Sidewalk - 400 East to 600 East
Infrastructure
Bidding
$360,000 CJ est. value
River Heights, UT 84321

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Cemetery Phase II
Infrastructure, Alteration
Post-Bid
River Heights, UT 84321

100 West Corridor Construction
Infrastructure
Results
Logan, UT

Us-91 - North Smithfield to Idaho Preservation High Volume
Infrastructure
Results
$1,500,000 to $3,000,000 est. value
UT

Berntson Estates Residential Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Logan, UT 84341

Berntson Estates Residential Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Logan, UT 84341

Providence City 2023 Roadway Maintenance Project
Infrastructure
Bidding
$1,800,000 CJ est. value
Providence, UT 84332

Construction of Amalga Town's Main Street Chip and Fog Seal Street Improvement Project
Infrastructure
Post-Bid
Amalga, UT

400 North Chip and Seal Project
Infrastructure
Results
Wellsville, UT

Last Updated 04/03/2023 04:15 PM
Project Title

Construction of Mendon Citys 200 West Street (Center to 200 South) and South Main Street (300 South to State Route 23) Improvement Projects

Physical Address View project details and contacts
City, State (County) Mendon, UT 84325   (Cache County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $250,929 [brand] Estimate
Plans Available from Civil Engineer - 01/11/23
Owner View project details and contacts
Architect View project details and contacts
Description

The project was awarded to LEGRAND JOHNSON CONSTRUCTION * 200 West Street (Center to 200 South) Legrand Johnson Construction amounting $181,174.40 & South main st. (300 South to Route 23) Legrand Johnson Contruction. amounting $69,755.50 (ToTal of $250,929.90) Sealed bids for construction of Men don City's 200 West Street (Center to 200 South) and South Main Street (300 South to State Route 23) Improvement Projects. Please address questions on the project to Eric Dustbuster, P.E., by email at edursteler@forsgren.com Description of Work: The Project generally includes pulverizing existing asphalt surfaces, widening roadway sections in certain locations, constructing stormwater crossings, re-grading and compacting the pulverized materials to proposed roadway grades, profiles, and existing driveways, placing hot mix asphalt thereon, and landscape reparation and restoration commencing from Center Street continuing south on 200 West to 200 South; and, commencing from 300 South to SR-23 on south Main Street; and, all work required therewith to construct the Project complete as to form and function. Bid Security: Bid security, which must be on the Bid Bond form provided with the Construction Documents or on approved Bid Bond documents provided by the Bonding Agency, in the amount of five percent (5%) of the bid, made payable to Mendon City, shall accompany the bid. A certified or cashier's check may be used for the bid bond. Project Administration: All questions relative to this project prior to the opening of bids shall be directed to the Engineer for the project, and all questions shall be in writing. For "or equal" items to be considered for evaluation, Contractor must submit information in compliance with the "Instructions to Bidders." No clarifications or questions will be answered three (3) days prior to bid date. Owner's Rights Reserved: Mendon City reserves the right to reject any or all bids and to waive any formality or technicality in any bid. Final quantities and project work portions will be dependent upon bids and the final project budgets.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents