Similar Projects
Jacking and Boring Services
Infrastructure
Post-Bid

Culvert Replacement - COL-SR 45-01.51
Results
OH

Fairfield Township 2021 Culvert Replacement
Infrastructure
Results
$225,000 est. value
Columbiana, OH

Culvert Replacement - COL-ODNR Highlandtown Culvert
Infrastructure
Results
OH 43930

West Salem Street Drainage Project
Results
$2,322,000 est. value
Columbiana, OH

Concrete Pipes
Infrastructure
Post-Bid

Leetonia High School Stadium Drainage Base
Results
Leetonia, OH

CR 430 Storm Line Extension
Infrastructure
Results
$353,611 est. value
Lisbon, OH

Box Culverts
Infrastructure
Post-Bid

Slide Repair - COL-SR 7-17.74
Infrastructure
Results
OH

Reventment Bags and Erosion Control Mats
Results

SR 45 - Culvert Replacement
Infrastructure
Results
$595,626 est. value
Lisbon, OH 44432

Concrete Pipes
Infrastructure
Post-Bid

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Results

Culvert Repair/Replacement Project
Infrastructure
Post-Bid
$440,000 est. value
East Palestine, OH

Reported 05/28/2022 12:00 AM
Project Title

Three Bridge Culvert Repairs

Physical Address View project details and contacts
City, State (County) East Palestine, OH   (Columbiana County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Culvert/Bridge #1 Location: East Adams St. near intersection of North James St. Work should include: o Clean, remove debris, and prepare the areas under the existing structure/culvert footers o Pour in-place reinforced concrete under the existing footers and between footers to direct water flow through the culvert o Divert waterflow during construction (if needed) o Strengthen inlet and outlet with concrete/stone to resist future erosion. Please indicate if the proposal will have wing walls, baskets of stone/gabions, rip-rap, or other form of erosion protection Culvert/Bridge #2 Location: Residential parking spot above Sulphur Run on North Summer St Work should include: o Removal of steel plate currently covering the damaged area o Clean, remove debris, and prepare the area o Form, add new reinforcing steel o Pour concrete and broom finish

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents