Similar Projects
St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14
Term Contract
Design
$1,000,000 to $5,000,000 est. value

As-Needed Pond Liner Replacement and Repairs
Infrastructure, Alteration
Bidding
Land O' Lakes, Spring Hill, Wesley Chapel, Zephyrhills, FL 34610

Dade Oaks Flood Detention Facility Project
Infrastructure
Bidding
Dade City, FL 33523

2020 Seawall Repair - Jasminpark
Post-Bid
$360,000 est. value
New Port Richey, FL 34652

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Sidewalk and Culvert for Pasco County Elderly Nutrition
Results
Dade City, FL 33525

Main Avenue and 15th Street Intersection Drainage Improvements Project
Results
$89,120 est. value
Dade City, FL 33523

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Howard Avenue Drainage Improvements - Phase II
Results
Less than $138,171 est. value
Dade City, FL 33525

As Needed Corrugated Polypropylene High Performance Storm Pipe – Multi-Year
Infrastructure
Results
New Port Richey, FL

Pompanic Street Paving and Draining Construction/Repair
Infrastructure
Results
San Antonio, FL 33576

Ongoing and As-Needed Fabric-Formed Concrete Revetment Mats
Term Contract, Infrastructure
Results
New Port Richey, FL

As Needed Class III Reinforced Concrete Pipe and Gaskets for Pipe Joints
Infrastructure
Results
New Port Richey, FL

Supply Riprap Erosion Control and Sidewalk Repair
Infrastructure
Results
Holiday, FL 34691

Storm Water Pipe Repair - Storm Water Pipe Rehabilitation and Inspection
Infrastructure
Results
$325,000 est. value

Last Updated 11/22/2021 01:32 AM
Project Title

Seven Springs Wastewater Treatment Facility Reject Pond Improvements

Physical Address View project details and contacts
City, State (County) FL   (Pasco County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall construct stormwater handling facilities, including a filterpoint erosion-control mat (FPM), culverts, and swales as shown on the Drawings. The work includes excavating, embankment, trenching, and backfilling (including excavating unsuitable material and backfill with satisfactory material) for the construction of stormwater facilities. The work also includes removing, replacing, and disposing of unsuitable soils encountered in the work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents