Similar Projects
Northstar Boulevard from: Route 50 to: 0.18 Miles South of Shreveport Drive
Bidding
$63,000,000 est. value
VA

Asphalt Paving Patch - 420 South Maple Avenue
Post-Bid
Less than $18,180 est. value
Purcellville, VA 20132

2019 Slurry Seal
Results
Less than $990,000 est. value

2019 Surface Treatment
Results
Less than $458,000 est. value

2019 Latex Modified
Results
Less than $2,191,000 est. value

On-Call Interstate Asphalt Concrete Patching
Results
Less than $847,000 est. value

2019 Plant Mix
Results
Less than $3,273,000 est. value
VA

High Friction Surface Treatment Paving
Results
Less than $925,000 est. value

2019 Plant Mix
Results
Less than $6,760,000 est. value
VA

Intersection Improvements at Main Street and Maple Avenue
Results
Purcellville, VA

Pavement Marking Eradication, Grooving
Term Contract
Results

32nd and A Street Intersection Improvements
Results
Purcellville, VA

W and OD Railroad Regional Park Asphalt Trail Repaving
Results
VA

Flexible Pavement Maintenance
Results
Leesburg, VA 20176

Evergreen Mills Rd Int Improvements at Relocated Rte 771
Results
Less than $1,868,000 est. value
VA

Last Updated 01/24/2019 05:12 AM
Project Title

2019 Plant Mix

Physical Address View project details and contacts
City, State (County) VA   (Loudoun County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,786,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 0010 10417 Tack Coat Gal 42,348.720 310 0020 16242 Aggr. Base Matl. Ty. i Or Ii No. 21a Or 21b Ton 783.000 Attd 0030 16335 Asphalt Conc. Ty. Sm-9.5a Ton 32,500.840 315 0040 16365 Asphalt Conc. Ty. Im-19.0a Ton 11,384.580 315 0050 16502 Surf. Preparation & Restoration Type Ii Ton 2,340.000 Attd 0060 16522 Flexible Pavement Planing 0" - 2" Sy 279,286.510 515 0070 16523 Flexible Pavement Planing Above 2" - 4" Sy 72,100.340 515 0080 24265 Maintenance Of Traffic Mot Lump Sum Lump 512 0090 24282 Flagger Service Hr 5,042.000 512 0100 54032 Type b Class i Pvmt Line Mrkg 4" Lf 110,687.000 704 0110 54042 Type b Class i Pave. Line Marking 24" Lf 771.000 704 0120 54400 Pvmt Message Mark. Only Ea 2.000 704 0130 54428 Temp. Pvmt Mrkg, Ty. a, 4" Lf 250,821.000 512 0140 54440 Temp. Pvmt Mrkg, Ty. a, 24" Lf 477.000 512 0150 54574 Pvmt Symb Mrkg Sgl Turn Arrow Ty b, Cl i Ea 9.000 704 0160 00306 Select Material Shoulder Maintenance Material Ton 1.000 Attd
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents