Similar Projects
East Greenwich Luxury Estates
Demolition, New Construction, Infrastructure
Conception
$7,800,000 CJ est. value
West Warwick, RI 02893

Woodsprings Suites - Post Road / Warwick
New Construction, Infrastructure
Conception
$30,400,000 CJ est. value
Warwick, RI 02886

Hallene Road Distribution Facility
New Construction, Infrastructure - 541,000 SF
Design
$58,400,000 CJ est. value
Warwick, RI 02886

Deslandes Construction Parking Garage
New Construction, Infrastructure - 10,800 SF
Design
$500,000 CJ est. value
Warwick, RI 02888

Southside Site Work and Grading
Infrastructure
Post-Bid
Warwick, RI

Providence Street (WW) Wall Repairs
Infrastructure, Renovation
Post-Bid
$2,000,000 CJ est. value
West Warwick, RI 02893

Cedar Swamp Force Main Rehabilitation
Infrastructure
Results
$13,935,935 CJ est. value
Warwick, RI 02889

Division Road Residences
New Construction, Infrastructure
Pending Verification
$158,000,000 CJ est. value
East Greenwich, RI 02818

Post Road Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Warwick, RI 02886

Cascade Falls
New Construction, Infrastructure
Conception
$10,500,000 CJ est. value
West Warwick, RI 02893

Warwick Avenue Gas Station / Warwick
Demolition, New Construction, Infrastructure - 4,600 SF
Design
$1,200,000 CJ est. value
Warwick, RI 02889

Site Improvements - Park Elementary School and Scott Elementary School
Renovation
Post-Bid
$500,000 est. value
Warwick, RI

Kilvert Street Multi Residential Development
New Construction, Infrastructure
Pending Verification
$90,600,000 CJ est. value
Warwick, RI 02889

Williams Street Multifamily Development
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Warwick, RI 02889

Buckeye Brook Restoration Project
Infrastructure
Post-Bid
$1,243,200 CJ est. value
Warwick, RI 02889

Last Updated 01/19/2023 07:08 PM
Project Title

Well #10 Pump Station Modifications Phase 1

Physical Address View project details and contacts
City, State (County) East Greenwich, RI 02818   (Kent County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $345,677 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

For Well #10 Pump Station NO BIDS WILL BE ACCEPTED AFTER THE WEDNESDAY, DECEMBER 14, 2022 2:00PM DEADLINE The work includes abandonment of on-site 2- to 12-inch diameter test wells, decommissioning of the historical Well #10 production well (inside the pump station), demolition and modification of select components of the Well #10 Pump Station, installation of a flood proof swing door, installation of a new exterior door, and all other work as described in the contract documents. SCOPE OF WORK AND SEQUENCE OF CONSTRUCTION A. The work in this contract is located in the Town of East Greenwich at #5897 Post Rd. B. The work consists of making modifications to the existing well #10 pump house including demo of various systems and piping, decommissioning old well #10, installing flood proof swing door and replacing exterior door, abandoning 12" test well, and all other work as described in the contract documents. C. All labor, materials, tools, equipment, and incidentals required to complete the work shall be provided by the Contractor. D. Prior notification of the Contractor's intent on where to work and a proposed schedule shall be submitted to the Owner and Engineer at least one week in advance of said work The Engineer for this project (design and construction phases) is Comprehensive Environmental Inc., 41 Main St, Bolton, MA 01740. Technical questions shall be directed to Michael Carmasine, telephone number 508-281-5160 x 333.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents