Similar Projects
C Station Wastewater Lift Station Replacement - City of Johnson City
New Construction, Renovation
Conception
Less than $3,400,000 est. value
Johnson City, TN 37615

Meadowbrook Lift Station Upgrade Construction - Town of Smyrna
Renovation
Conception
$7,000,000 CJ est. value
Smyrna, TN 37167

RFQ - Relief Well Maintenance Services
Term Contract
Bidding
Memphis, TN 38103

Irrigation Pump Station
Renovation
Bidding
$600,000 CJ est. value
Hendersonville, TN 37075

Sheahan Filter Valve Replacement
Renovation
Post-Bid
Memphis, TN 38111

Taylor ES Pump Station and Sanitary Sewer (Force Account)
New Construction, Infrastructure
Post-Bid
Cleveland, TN 37323

Influent Pumping Station
Renovation
Results
$330,000 est. value
Savannah, TN

Highway 31 Water Booster Station and Master Meter
New Construction
Results
Spring Hill, TN

Tiftonia Pump Station #1 Safety Upgrade - City of Chattanooga
Renovation
Conception
$5,150,000 CJ est. value
Chattanooga, TN 37402

American Rescue Plan (ARPA) Water System Improvements.
Demolition, New Construction, Infrastructure
Bidding
$487,000 CJ est. value
Harriman, TN 37748

Mowing & String Trimming - Water/Sewer Pump Station Sites
Renovation, Infrastructure
Post-Bid
Johnson City, TN

Shady Oaks Pump Station Improvements
Renovation
Results
$600,000 est. value
Millington, TN 38053

Tiftonia Pump Station #3 Safety Upgrade - City Of Chattanooga
Renovation
Conception
$3,075,000 CJ est. value
Chattanooga, TN 37402

Park 840 Water Pump Station Electrical and Mechanical Modifications
Renovation
Bidding
$587,000 CJ est. value
Lebanon, TN 37087

Shaw Filter Valve Replacement
Renovation
Post-Bid
Cordova, TN 38018

Last Updated 07/18/2023 10:07 AM
Project Title

Hwy 22 Sewer Pumping Stations Renovations

Physical Address View project details and contacts
City, State (County) Clarksburg, TN 38344   (Carroll County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $520,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work involved is in one (1) contract and consists of the following generally described work: CONTRACT 22-01 - HIGHWAY 22 SEWER PUMPING STATIONS RENOVATIONS o Renovation of two sewer pumping stations o Replacement of top mounted suction lift pumps o Installation of new submersible pumps o All associated piping and electrical. The allotted time for construction for this contract is one hundred eighty (180) calendar days. Liquidated damages for non-completion are $500 per calendar day. This project is being supported with Treasury, Coronavirus State and Local Recovery Fund grant funding; therefore, certain restrictions and other federal requirements attach to this opportunity. Each potential bidder shall include with his payment his contractor's license number, bonding limit and license expiration date. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Instructions for Bidders. All bidders must be licensed general contractors as required by the Contractor's Licensing Act of 1976 of the General Assembly of the State of Tennessee and qualified for the type of construction being bid upon. Each bidder shall write on the outside of the envelope containing his bid his contractor's license number, the expiration date, and that part of the classification applying to this bid. If this is not done, the bid will not be opened. The Copeland "Anti-Kickback" Act is also applicable, which prohibits workers on construction contracts from giving up wages that they are owed. Contractors must not appear on Sam.gov disbarment list. All bidders shall comply with all provisions of TCA 50-9-113 as it relates to Drug-Free Workplace requirements. The Contractor shall complete the Drug-Free Workplace Affidavit of the Prime Bidder form and submit it with his/her bid. The Contractor shall be responsible for any of its Subcontractor(s) compliance with said law. All bidders shall comply with all provisions of Chapter 878 of TCA 12-4-1 as it relates to certification of compliance regarding illegal immigrants. The Contractor shall complete the Statement of Compliance Certificate Illegal Immigrants and submit it with her/her bid. The Contractor shall be responsible for any of its Subcontractor's compliance with said law. In compliance with TCA 12-4-126(a) and (b) the ENGINEER will not issue addenda less than forty-eight (48) hours before the bid opening date and time; further, any questions concerning the bid documents shall be received by the ENGINEER before ninety-six (96) hours prior to the bid opening date and time. The successful bidder is required to furnish both an acceptable performance bond and payment bond each in the amount of one hundred percent (100%) of the contract price. The Owner reserves the right to reject any all bids, to waive informalities, and to negotiate with the apparent qualified best bidder or bidders to such extent as may be necessary. No bidder may withdraw his bid for 60 days, while the Owner considers the bids. Mutually agreed upon time extensions may be made if necessary. Inquiries should be directed to W. Scott Daniel, P.E., Vice President, scottd@jrwauford.com.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents