Last Updated | 10/20/2021 12:48 PM |
Project Title | Wastewater Treatment Plant Expansion and Treatment Modifications |
Physical Address | View project details and contacts |
City, State (County) | Gypsum, CO 81637 (Eagle County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Town of Gypsum is in Eagle County, along Colorado along I-70 approximately 130 Miles west of Denver. The Town of Gypsum Wastewater Treatment Facility (WWTF) is an Aeromod Sequox plant located to the northwest of the Town on the northern bank of the Eagle River. The WWTF, which was constructed in 2002 to replace the existing lagoon system, has a design hydraulic capacity of 0.96 million gallons per day (MGD) and a biochemical oxygen demand (BOD) loading capacity of 2,000 pounds per day. The WWTF consists of two primary and two secondary aeration tanks, two aerobic digester tanks, two clarifier tanks, and a UV disinfection system. Influent is pumped to the plant via 6 lift stations, and effluent is discharged to the Eagle River. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Water Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |