Similar Projects
Middle School South Roofing Removal & Replacement
Bidding
Vernon Hills, IL 60061

Roofing Envelope Services
Post-Bid

Multi-Tiered Guaranteed Savings Contract
Term Contract
Post-Bid
Grayslake, IL 60030

Water Reclamation Facility Roof Rehabilitation
Results
Mundelein, IL 60060

Replace Roofing System & Repair Interior
Results
$100,000 to $150,000 est. value
Zion, IL 60099

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

2020 Deer Creek Racquet Club Roof Improvements
Renovation
Results
Highland Park, IL 60035

2020 Roof Replacement
Post-Bid
North Chicago, IL 60064

Recreation Center Roof Improvements
Results
Highland Park, IL 60035

Roofing Repair and Maintenance
Post-Bid

Replace Roofing Systems Statewide, Phase I
Results
Less than $2,000,000 est. value

Standing Seam Metal Roofing
Post-Bid
Highwood, IL 60040

Replace Roofing System Kiley Development Center
Results
Less than $500,000 est. value
Waukegan, IL 60085

Steep Slope Roofing Replacement on the Oak Terrace Elementary School
Post-Bid
Highwood, IL 60040

Roof Replacements at Mitchell Park and Pool
Results
Deerfield, IL 60015

Last Updated 08/12/2020 04:28 PM
Project Title

Bittersweet Club House Roof

Physical Address View project details and contacts
City, State (County) Gurnee, IL 60031   (Lake County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and disposal of all current roof materials down to the wood decking. Remove old and supply and install 300 square feet of plywood roof sheathing at the northwest corner of building. Supply and install Ice and Water Shield minimally to the first 36 inches from the fascia and valleys and cover all exposed roof decking with a minimum of 30# roof felt in all areas with greater than a 3/12 pitch. Supply and install minimum thirty (30) year laminated Forest Green architectural shingles to all areas with greater than a 3/12 pitch. Supply and install a sealed down base sheet to all areas with less than a 3/12 pitch. Supply and install Modified Bitumen Membrane to all roof areas with less than a 3/12 pitch. Remove old and supply and install new ridge vents with color matching ridge cap shingles. Remove old and supply and install new lead flashing to all pipe vents. Reinstall and flash around all roof penetrations and utilizing flashing kits, minimal amount of roofing cement and/or caulk shall be utilized. Remove old and supply and install new white aluminum Gutter Apron Flashing. Remove old and supply and install new white aluminum Rake Edge Flashing. Supply and install new roof to wall vents on the lower sections on the north and south sides of the building, these vents are currently in place, therefore it will just be replacing them with new ones. Complete tuck pointing and repairs to brick chimney. The job site needs to be left broom cleaned each evening and on completion of the project the pavement, lawn, gutters and downspouts will be cleaned and debris free.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents