Similar Projects
Mohr Elementary Campus Wide Exterior Painting
Alteration
Post-Bid
Pleasanton, CA 94588

Valley View Elementary School Exterior Painting
Alteration
Post-Bid
Pleasanton, CA 94566

RCD First Floor Window Painting
Alteration
Results
$91,000 est. value
Oakland, CA 94612

Exterior Painting at Stonebrae Elementary School
Alteration
Results
$135,000 est. value
Hayward, CA 94542

Electrical, Plumbing, Painting, Landscaping and Tree Services
Term Contract
Post-Bid
Oakland, CA

Exterior Painting at Martin Luther King Middle School
Alteration
Results
$230,000 est. value
Hayward, CA 94545

Street Academy School Exterior Painting
Alteration
Post-Bid
$120,000 est. value
Oakland, CA 94609

Exterior Painting at East Avenue Elementary School
Alteration
Results
$175,000 est. value
Hayward, CA 94541

Special Education Office Exterior Painting
Alteration
Post-Bid
$150,000 est. value
Oakland, CA 94608

Exterior Painting at Tyrrell Elementary School
Alteration
Results
$170,000 est. value
Hayward, CA 94544

Castlemont High School Exterior Painting
Alteration
Post-Bid
$750,000 est. value
Oakland, CA 94605

Exterior Painting at Burbank Elementary School
Alteration
Results
$198,000 est. value
Hayward, CA 94541

Interior Painting, Installation of Protective Wall Covering, and Replacement of Rubber Cove Base at the Hayward Department of Motor Vehicles (DMV) Field Office
Term Contract
Post-Bid
$45,000 est. value
Hayward, CA 94544

Exterior Painting at Schafer Park Elementary School
Alteration
Results
$161,000 est. value
Hayward, CA 94544

Lower Hearst Parking Structure Re-Painting
Alteration
Post-Bid
$300,000 est. value
Berkeley, CA 94709

Last Updated 04/26/2023 04:16 PM
Project Title

Global Family Elementary School Exterior Painting

Physical Address View project details and contacts
City, State (County) Oakland, CA 94601   (Alameda County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status All Submissions Received, Selection Underway, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $190,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of work to include but not limited to prep, prime and paint exterior of the entire site according to the District's specifications and standards. Engineer's Estimate: $190,000 For questions or assistance concerning the Project Labor Agreement, contact Maribel Alejandre, (510) 835-7603 X 21, Davillier-Sloan, Inc. 1630 12th Street, Oakland, California, 94607. Project Manager is Marcus Board, who can be reached at: marcus.board@ousd.org or 510-277-6719. The lowest bid shall be determined on the amount of the base bid. The lowest bid shall be determined on the amount of the base bid. This Contract is not subject to prequalification pursuant to Public Contract Code section 20111.6. Public works projects shall be subject to compliance monitoring and enforcement by the Department of Industrial Relations. For all projects over Twenty-Five Thousand Dollars ($25,000), a contractor or subcontractor shall not be qualified to submit a bid or to be listed in a bid proposal subject to the requirements of Public Contract Code section 4104 unless currently registered and qualified under Labor Code section 1725.5 to perform public work as defined by Division 2, Part 7, Chapter 1 (1720 et seq.) of the Labor Code. For all projects over Twenty-Five Thousand Dollars ($25,000), a contractor or subcontractor shall not be qualified to enter into, or engage in the performance of, any contract of public work (as defined by Division 2, Part 7, Chapter 1 (1720 et seq.) of the Labor Code) unless currently registered and qualified under Labor Code section 1725.5 to perform public work and proof of registration is provided. The Contract Time shall be thirty-one (31) calendar days, and liquidated damages for delay shall accrue. The deadline for Completion is _TBD. Bids must be accompanied by a bidder's bond, cashier's check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner, as detailed in the Contract Documents. Owner, or its designee, has determined that certain materials, services, products or things designated by specific brand or trade name shall not be subject to Public Contract Code section 3400(a) in order that a field test or experiment may be made to determine the product's suitability for future use; in order to match other materials, services, products or things in use on a particular Owner public improvement either completed or in the course of completion; in order to obtain a necessary item that is only available from one source; and in order to respond to an emergency declared by Owner. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum. The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement Between Owner and Contractor and General Conditions. The Owner will not consider or accept any bids from contractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the bidder shall have a Class C-33 Painting Contractor license at the time of award and shall maintain that license in good standing through Completion of the Contract and all applicable warranty periods. For all projects over Twenty-Five Thousand Dollars ($25,000), the bidder shall state the public works contractor registration number on the Designation of Subcontractors form for each subcontractor performing more than one-half of one percent (0.5%) of the bidder's total bid. The Director of Industrial Relations of the State of California, in the manner provided by law, has ascertained the general prevailing rate of per diem wages and rate for legal holidays and overtime work. The Contractor must pay for any labor therein described or classified in an amount not less than the rates specified. Copies of the required rates are on file at the Owner's business office and are available on request.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents