Similar Projects
Huntley Hall Renovation and Addition
Renovation, Addition - 31,404 SF
Bidding
$7,000,000 to $8,000,000 est. value
Richmond, VA 23220

On Demand Construction and Skilled Trades Services
Renovation
Bidding
$500,000 est. value

VCU Johnson Hall Envelope Repairs
Post-Bid
Richmond, VA 23220

MCV Alumni House Second Floor Renovations
Renovation
Post-Bid
Richmond, VA

VCCS System Office Interior Alterations
Renovation
Results
Richmond, VA

VCU Sanger 9 Surgery Innovation Suite
Renovation - 8,000 SF
Results
$344,488 est. value
Richmond, VA 23298

Grant House 1st and 3rd Floor Renovation
Renovation
Post-Bid
Richmond, VA 23284

Renovate 6th Floor Labs - Sanger Hall
Renovation
Post-Bid
Richmond, VA 23284

Brandt and Rhoads Halls Director and GA Apartment
Renovation
Post-Bid
Richmond, VA

Hermes A. Kontos Medical Sciences Building; Mezzanine Level Alterations
Renovation
Post-Bid
Richmond, VA

Robert Blackwell Smith Building; Alterations to Labs 522, 524and 526
Renovation
Post-Bid
Richmond, VA

VCU Re-Pointing Bricks and Misc Exterior Repairs Raleigh Building
Renovation
Post-Bid
Richmond, VA 23284

VCU Chimney Repair Thurston House
Post-Bid
Richmond, VA 23284

VCU Honors College Office and Classroom Relocation
Renovation - 7,302 SF
Post-Bid
Richmond, VA 23220

VCU Physical Plant Warehouse #1 Alterations
Renovation
Post-Bid
Richmond, VA 23219

Reported 03/04/2021 12:00 AM
Project Title

Virginia Commonwealth University Brandcenter Basement Renovation

Physical Address View project details and contacts
City, State (County) Richmond, VA 23284   (Chesterfield County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work Included: The Work of this Section includes, but is not limited to the following: 1. Selective demolition and removal of interior floors, walls, partitions and ceilings of existing building, to the extent shown on the Drawings and as required to accommodate the new construction. 2. Selective demolition and removal of existing assemblies and structures of the existing building, to the extent shown on the Drawings and as required to accommodate the new construction. 3. Protection of existing portions of building or adjacent areas affected by selective demolition. 4. Vibration control and dust control noise control. 5. Disconnection, capping, and removal abandoned utilities and wiring systems. 6. Removal and legal disposal of materials.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents