Similar Projects
Kearney Park - New Playground - City Of Watsonville
Infrastructure
Conception
$400,000 CJ est. value
Watsonville, CA 95076

Garfield Park Playground - c302217 - City of Santa Cruz
Infrastructure
Conception
$300,000 CJ est. value
Santa Cruz, CA 95060

Felker Street Apartments
New Construction, Infrastructure
Design
$10,125,396 CJ est. value
Santa Cruz, CA 95060

Santa Cruz Jeep
Demolition, New Construction, Infrastructure - 5,602 SF
Design
$1,500,000 CJ est. value
Santa Cruz, CA 95060

Natural Bridges Apartments
New Construction, Infrastructure - 15,000 SF
Post-Bid
$6,000,000 CJ est. value
Santa Cruz, CA 95060

Redwood Road Pm 0.23 0.31 0.33 Storm Damage Repair Project
Infrastructure
Post-Bid
$680,740 CJ est. value
Santa Cruz, CA 95060

Rail Trail Segment 7 Phase 2
Infrastructure
Results
$10,853,016 CJ est. value
Santa Cruz, CA 95060

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Harvey West Studios
Demolition, New Construction, Infrastructure - 49,961 SF
Pending Verification
$14,000,000 CJ est. value
Santa Cruz, CA 95060

Church Street Library Redevelopment - City of Santa Cruz
New Construction, Infrastructure, Renovation
Pending Verification
$35,000,000 CJ est. value
Santa Cruz, CA 95060

Frederick Street Park Picnic Area - c302216 - City of Santa Cruz
Infrastructure
Conception
$285,000 CJ est. value
Santa Cruz, CA 95062

Capitola Hotel
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Capitola, CA 95010

Green Valley Road Multi-Use Trail Improvements Project
Infrastructure
Post-Bid
$6,475,751 CJ est. value
Watsonville, CA 95076

Hazel Dell Road (PM 2.00, 2.08, 2.13, 2.16, 2.21, 2.37 and 2.58) Storm Damage Repair Project
Infrastructure
Results
$7,159,511 CJ est. value
Watsonville, CA 95076

La Madrona Mixed-Use Development
New Construction, Infrastructure - 6,600 SF
Pending Verification
$99,000,000 CJ est. value
Scotts Valley, CA 95060

Last Updated 10/10/2023 04:42 PM
Project Title

Brackney Landslide Area Pipeline Risk Reduction Project

Physical Address View project details and contacts
City, State (County) Santa Cruz, CA 95060   (Santa Cruz County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Accepting Qualifications, Request for Qualifications, Construction start expected November 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $8,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project ID: RFQ WT-0042 (CWO#20-003) Range of Design Consultants Opinion of Probable Construction Cost Low: $7,200,000 - High: $8,800,000 Question Deadline 10/04/2023 Deadline for RFIs questions from Contractors 54532, 91242 Project scope includes but is not limited to approximately 1600 feet of 30 inch HDPE via HDD, 1000 feet of 24 inch PVC via open cut. Project area is located near Highway 9 between Glen Arbor Road and Brackney Road in close proximity to San Lorenzo River. As of September 7, 2023, the owner has released a request for statements of qualifications. Project schedule: RFQ release 9/1/2023 SOQ due 10/7/2023 Short list of pre-qualified contractors October 2023 Construction NTP/ Mobilization March / April 2024 Construction is anticipated to require 1 year. Range of Design Consultant's Opinion of Probable Construction Cost Low: $7,200,000 - High: $8,800,000 The Project includes the installation of approximately 1,700 ft of HDD, and approximately 900 ft of open trench pipeline within private and County roads, in Ben Lomond, California, between Glen Arbor Rd and Brackney Rd. The HDD pipeline is a 24-inch (ID) HDPE pipeline. Conductor casings, approximately 108 ft and 97 ft in length, are required at each side of the HDD. The conductor casings are steel pipelines with a minimum diameter of 48-inches. The Prime Contractor's Scope of Work for the Project includes, but is not limited, to the following: a. Installation of 24" (ID) diameter HDPE/PVC pipeline and associated appurtenances between Glen Arbor Rd and Brackney Rd: i. Installation of conductor casing, approximately 108 ft and 97 ft in length, at each side of the HDD conductor casing. Conductor Casing installation work must be performed by a prequalified Conductor Casing Installation Contractor. ii. Installation of approximately 1,700 ft, 24" (ID) diameter HDPE pipeline via Horizontal Directional Drilling using the drill-and-intersect method. HDD work must be performed by a pre-qualified HDD contractor. iii. Installation of approximately 900 LF, 24" diameter PVC pipeline via conventional open-cut iv. Two tie-ins to the existing pipeline on Glen Arbor Rd and Brackney Rd. v. Restoration of work areas to pre-construction conditions

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents