Similar Projects
Caseys General Store / Evansville
New Construction, Infrastructure
Conception
$1,350,000 CJ est. value
Evansville, IN 47708

Site Plan - South Weinbach Avenue & Lincoln Avenue / Mixed Use - University of Evansville
New Construction, Infrastructure - 3,500 SF
Design
$959,000 CJ est. value
Evansville, IN 47714

CenterPoint Energy Power Facility / Evansville
Addition, Demolition, Build-out, Infrastructure
Design
$2,000,000 CJ est. value
Evansville, IN 47714

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Evansville Skate Park Completion Projection Project
Infrastructure
Bidding
$500,000 CJ est. value
Evansville, IN 47713

Project Specifications For Evansville SMD Street Maintenance Department Relocation
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Evansville, IN 47711

Project Specifications For Evansville SMD Street Maintenance Department Relocation
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Evansville, IN 47711

Green River Road Trail Project
Infrastructure
Post-Bid
$40,000 est. value
Evansville, IN 47725

Preventative Maintenance for and Fire Sprinkler and Standpipe System and Fire Hydrants
Infrastructure
Post-Bid
Evansville, IN 47714

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Maryland Street Water Main Replacement
Infrastructure
Results
Evansville, IN 47710

2022 Mill and Overlay - Phase II
Infrastructure
Construction
$1,097,983 CJ est. value
Evansville, IN 47708

2022 Mill and Overlay - Phase II
Infrastructure
Construction
$1,097,983 CJ est. value
Evansville, IN 47708

Ohio River Crossing Projects - Kentucky Transportation Cabinet
Infrastructure
Pending Verification
$1,212,000,000 CJ est. value
Evansville, IN 47714

Ohio River Crossing Projects - Kentucky Transportation Cabinet
Infrastructure
Pending Verification
$1,212,000,000 CJ est. value
Evansville, IN 47714

Last Updated 03/03/2023 09:33 AM
Project Title

Franklin Street Sewer Rehabilitation - Phase 3

Physical Address View project details and contacts
City, State (County) Evansville, IN 47712   (Vanderburgh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,008,700 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Any bids received later than the above time and date will be returned unopened. No conditional bids will be considered. The work for which bids are to be received consists of: The work for which bids will be received includes the manned-- entry rehabilitation of approximately 650 linear feet of 72-inch reinforced concrete pipe. The manned-entry rehabilitation work will include heavy sewer cleaning, urethane and epoxy injection grouting through the pipe wall into the surrounding pipe bedding, as well as troweled on epoxy mastic for sealing pipe joints within the pipe. Additionally, the work will include rehabilitation of a manhole base. The work will also require bypass pumping of combined sewer flows on an as-- needed basis, as well as traffic control. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary to complete the work shown in the Drawings and Specifications. All work must be ready for satisfactory and continuous operation, in accordance with the Drawings and Specifications. The above referenced project description includes items that are part of the Itemized Base Bid. The Contractor shall be responsible for all work shown on the plans and described in the specifications pertaining to the Itemized Base Bid, regardless of the installation method chosen. The Evansville Water and Sewer Utility further reserves the right to waive informalities, and to award the contract to the lowest and most responsible bidder (or bidders), all to the advantage of the Evansville Water and Sewer Utility, or to reject all Proposals.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents