Similar Projects
145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

Roundabout at CSAH 11 at Burnsville Parkway in Burnsville - 11-27 - Dakota County
Infrastructure
Conception
$2,100,000 CJ est. value
Burnsville, MN 55337

Antlers Community Park - P-9 - City of Lakeville
Infrastructure
Conception
$11,575,000 CJ est. value
Lakeville, MN 55044

New CR 32 (Cliff/117th Street) from CSAH 32/CSAH 71 (Rich Valley Boulevard) to Trunk Highway 52 - 32-065 - Dakota County
Infrastructure
Conception
$19,016,375 CJ est. value
Inver Grove Heights, MN 55077

Norton Creek Flood Control - 603-60-22524 - City of Fridley
Infrastructure
Conception
$900,000 CJ est. value
Fridley, MN 55432

CSAH 28 (Yankee Doodle Road) at Elrene Road, at Mike Collins Drive in Eagan - 28-44 - Dakota County
Infrastructure
Conception
$680,000 CJ est. value
Eagan, MN 55123

New CSAH 81 (Clayton Avenue) from CSAH 66 (200th Street) to CSAH 46/48 (Brandel Drive) in Empire Township - 81-14 - Dakota County
Infrastructure
Conception
$10,500,000 CJ est. value
Hastings, MN 55033

Greenway Development: Minnesota River Greenway - Fort Snelling Segment - P00127 - Dakota County
Infrastructure
Conception
$7,425,139 CJ est. value
Eagan, MN 55123

Kelley Park Master Plan
Infrastructure
Conception
$1,000,000 CJ est. value
Apple Valley, MN 55124

Indian Creek Pump Station Facility and Electrical - City of Mankato
Renovation, Infrastructure
Conception
$806,916 CJ est. value
Mankato, MN 56001

Point Douglas Park Facility Improvements - PARK-9002 - Washington County
Demolition, New Construction, Infrastructure
Conception
$850,000 CJ est. value
Hastings, MN 55033

Anoka Metro Regional Treatment Center Miller Building Upgrade
Build-out, Renovation, Infrastructure
Conception
$6,600,000 CJ est. value
Anoka, MN 55303

CSAH 85 (Hogan Avenue) at TH 50 (240th Street East) - 85-xx - Dakota County
Infrastructure
Conception
$900,000 CJ est. value
New Trier, MN 55031

Park Development: Lebanon Hills Regional Park Connector Trail - P00063 - Dakota County
Infrastructure
Conception
$1,350,000 CJ est. value
Eagan, MN 55123

Last Updated 01/23/2023 10:34 PM
Project Title

Olivia City Hall and Public Safety Facility

Physical Address View project details and contacts
City, State (County) Olivia, MN 56277   (Renville County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

TYPE OF PROJECT: The Project consists of the construction of the addition/renovation of the Olivia City Hall and Fire Department; with the addition of the Police Department, this will create the Olivia City Hall and Public Safety Facility. TYPE OF BID Contract Type: A single prime contract based on a Stipulated Price. BID SECURITY: Each bid must be accompanied by a bid bond, certified check or cashiers check for at least five percent (5%) of the amount of the bid, made payable to City of Olivia. Electronic bids and faxes will not be accepted City of Olivia reserves the right to reject any and all bids and to waive irregularities and informalities therein and further reserves the right to award the contract to the best interests of City of Olivia .

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Multiple Seating.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire-Suppression Sprinkler Systems, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents