Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

I-75 MLK DDI
Bidding
FL

Eastport Road Force Main Extension
Bidding
Jacksonville, FL 32214

Resurface Pavement
Renovation
Post-Bid
Inverness, FL 34450

St. Joseph Peninsula State Park Roadway Project
Post-Bid
Port Saint Joe, FL 32456

NE 2nd Way Roadway Improvements
Results
Trenton, FL 32693

CR 236 Widening and Resurfacing
Results
Less than $693,313 est. value
FL

2021 Road and Bridge Paving Program
Bidding
$7,909,024 est. value
Port Charlotte, FL

US 301 Bloomingdale
Post-Bid
FL

Bayou Drive Shoulder Repair
Results
FL

Pre-Event Emergency Roadside Assistance Services
Bidding

NE 154th Street Resurfacing
Post-Bid
FL

Picayune Strand Restoration Project, Miller Tram and Road Removal and Associated Works, Collier County, FL
Results
$9,000,000 to $14,000,000 est. value
FL

Pre-Event Emergency Roadside Assistance Services
Bidding

Cons-Palmave/0908
Post-Bid
Punta Gorda, FL

Last Updated 02/01/2021 10:29 PM
Project Title

Loveland Boulevard Pathway

Physical Address View project details and contacts
City, State (County) Port Charlotte, FL 33948   (Charlotte County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $619,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of a Multi-Use Pathway on Loveland Boulevard from Peachland Boulevard to Veterans Boulevard in Port Charlotte. The project includes, but is not limited to, concrete multi-use path construction, clearing and grubbing of the County right-of-way, driveway reconstruction and minor drainage modifications, removal and disposal of existing structures, flow diversion, excavation and fill, grading, sodding, and maintenance of traffic. The work specified herein shall consist of furnishing all materials, equipment, labor and operations necessary to complete the work as indicated in the plans and specifications. FDOT certification required

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents