Similar Projects
Floodwall Rehabilitation Project
Infrastructure
Bidding
Parkersburg, WV

Williamson (Hight) Drainage and Portals
Infrastructure
Bidding
Charleston, WV

Mountain Valley Elementary School Renovations
Renovation
Post-Bid
Bluefield, Princeton, WV 24701

Improve Airport Drainage, Phase 1
Post-Bid
Huntington, WV

Dallas Pike Road Slip Repair +5
Results
WV

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Buffalo Creek and Gauley Flood Repairs
Post-Bid
Clay, WV 25043

US 250 at MP 10.47
Results
WV

Lower Mud River Levee Protection Project
Term Contract
Post-Bid
$25,000,000 to $100,000,000 est. value
Milton, WV 25541

US 250 at MP 17.24
Results
WV

Drain Replacement in the Student Center Ram's Den
Infrastructure
Post-Bid
Shepherdstown, WV

Walnut Hill
Results
WV

Pike Island Monolith R33 and RR34 River Wall Crack Stabilization 2020
Results
$500,000 to $1,000,000 est. value
Wheeling, WV 26003

Jewell Hill
Results
WV

Improve Airport Drainage - Phase II
Results
Less than $590,760 est. value
Charleston, WV 25311

Last Updated 06/24/2021 11:31 AM
Project Title

OSR Eagle Ridge Development S-3027-05 Land Reclamation

Physical Address View project details and contacts
City, State (County) Philippi, WV   (Barbour County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall perform all operations necessary for: erosion and sediment control with best management practices to include silt fence, rock check dams, sumps, and rocked culvert outlet protection; clearing and grubbing at the site and windrowing the cleared and grubbed material and removing all man-made debris, trash, and garbage; maintenance of support areas and access roads to the site and coordination of work activities with local residents and complying with WVDOH rules and regulations; construction and surfacing of designated access roads; elimination (regrading to sheet flow) all designated sediment ditches; rehabilitation and cleaning of designated sediment ditches, to also include outlet rip-rap channel in select areas; place additional backfill at the previously backfilled highwall area and knob area designated on the plan; regrade knob areas designated on the plan; construction of diversion channels, drive-thrus and drainage flumes; relocation of existing access roads B and D to more moderate grades; replacement of security gate at entrance of main access road; revegetation of both previously reclaimed and newly disturbed areas. The Contractor shall also be responsible for surveying, furnishing, placing, and maintaining construction layout stakes necessary for the proper execution of the work required under the Contract, and for ordering, purchase and delivery of any and all materials required for construction or required for development of support areas. The Contractor shall perform all other operations as incidental to the program as specified herein.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents