Similar Projects
Performing Arts Annex, Gymnasium & Athletic Turf Field
New Construction
Conception
$30,000,000 est. value
Chicago, IL 60618

Clock Tower Center & Ornamental Horticulture Remodel
Renovation
Conception
Less than $3,021,067 est. value
Danville, IL 61832

University of Chicago Wexford Tower
New Construction
Design
Chicago, IL

Building P Police Locker Rooms
Renovation - 750 SF
Bidding
Palos Hills, IL 60465

Building A Culinary Center at Harper College
Renovation
Bidding
Palatine, IL

Renovate Classroom 250 at Science and Engineering South - Bid Package - Division 01
Renovation
Post-Bid
Chicago, IL 60607

Des Plaines Cafeteria
Renovation
Post-Bid
Des Plaines, IL 60016

Classroom Modernization Renovations
Renovation
Results
Grayslake, IL 60030

LC New Health and Education Building
- 17,644 SF
Results
Less than $5,000,000 est. value
Pontiac, IL 61764

Shimer Square - Bennett & Hathaway Hall Rehabilitation
Renovation
Construction
Mount Carroll, IL 61053

The Illini Chabad Jewish Center
Renovation
Construction
$1,600,000 est. value
Champaign, IL 61820

Harper College University Center Building
Pending Verification
$83,000,000 est. value
Palatine, IL 60067

Campus Development
New Construction
Pending Verification
Riverwoods, IL 60015

Technology Center
New Construction
Conception
Less than $11,160,000 est. value
Robinson, IL

UIUC Research Park
New Construction - 60,000 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Urbana, IL 61801

Last Updated 02/25/2021 05:45 PM
Project Title

Beckman Institute - Cancer Center Basement Lab

Physical Address View project details and contacts
City, State (County) Champaign, Urbana, IL 61801   (Champaign County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Divisions: 02-Plumbing Work 03-Heating A/C Temp Control Work 04-Ventilation Work 05-Electrical Work The project work shall include the renovation of approximately 4,580 sf of the north-west corner of the basement at Beckman Institute for a newly designed Cancer Center. The spaces currently house offices and laboratory spaces. This renovation will convert the space into research laboratory space.

Details

College/University, Renovation, 1 College/University, 4,580 SF Renovation, SF.
Division 21 - Fire Suppression, Common Work Results for Fire Suppression, Hangers and Supports for Fire-Suppression Piping and Equipment, Identification for Fire-Suppression Piping and Equipment, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm, Fire Alarm Initiating Devices.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents