Similar Projects
2021 Sewer Line Rehabilitation Project
Bidding
Clifton, CO 81520

2021 Preventative and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO

Denver Coliseum Storm Drain Repair
Post-Bid
Denver, CO 80202

Cherry Creek Interceptor Project
Post-Bid
Parker, CO

Storm Drainage Rehabilitation and Improvements
Results
Longmont, CO 80501

2020 Cherrymoor South Interceptor Rehabilitation
Results
Cherry Hills Village, CO 80113

Cherry Creek Interceptor Project - Trenchless Construction Portion
Post-Bid
Parker, CO

South Englewood Storm Sewer Maintenance
Results
Englewood, CO 80110

CR Water Projects Request for Pre-qualifications
Post-Bid
Castle Rock, CO 80104

2019 Ridge Road Storm Sewer Project
Results
Less than $248,850 est. value
Littleton, CO 80120

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

2020 Townwide Storm Pipe Camera and Vacuum Cleaning
Results
$30,000 to $50,000 est. value
Parker, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

Stormwater Facility Maintenance
Post-Bid
Canon City, CO

Last Updated 12/14/2020 05:01 PM
Project Title

PPRTA Pipe Lining Projects

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work on Flintridge Drive includes lining approximately 62 linear feet of existing 12-inchdiameter corrugated metal storm pipe, lining approximately 413 linear feet of existing 24-inch diameter corrugated metal storm pipe, lining approximately 757 linear feet of existing 30-inch diameter corrugated metal storm pipe, lining approximately 435 linear feet of existing 54-inch diameter corrugated metal storm pipe, lining approximately 950 linear feet of existing 60-inch diameter corrugated metal storm pipe, and lining approximately 910 linear feet of existing 69-inch diameter corrugated metal storm pipe. Work on Dublin Boulevard includes lining approximately 376 linear feet of existing 24-inch-diameter corrugated metal storm pipe. Work on Platte Avenue includes lining approximately 120 linear feet of existing 12-inchdiameter corrugated metal pipe, lining approximately 318 linear feet of existing 12-inchdiameter clay pipe, lining approximately 68 linear feet of 15-inch-diameter corrugated metal pipe, lining approximately 100 linear feet of 24-inch-diameter corrugated metal pipe, lining approximately 160 linear feet of 14-inch x 27-inch elliptical reinforced concrete pipe, and lining approximately 133 linear feet of storm pipe consisting of 324-inch x 30-inch concrete box culvert that transitions to 24-inch x 29-inch corrugated metal pipe that transitioning to 29-inch-diameter corrugated metal pipe.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents