Similar Projects
Remove Six Dam Structures (Design/Build Project)
Bidding
$5,000,000 to $20,000,000 est. value

Remove Six Dam Structures (Design/Build Project)
Bidding
$5,000,000 to $20,000,000 est. value

Central Business District Tunnel Lighting and Conduit Replacement
Post-Bid
Pittsburgh, PA 15222

FE Walter Dam, White Haven - PA, Inspection and Repair of Right Service Gate in Tower
Post-Bid
$250,000 to $1,000,000 est. value
White Haven, PA 18661

Capitol Complex - Central Plant Steam Tunnel Repairs
Results
Less than $1,800,000 est. value
Harrisburg, PA

Marquette Lake Dam - Improvements to Marquette Lake Dam
Results
Less than $8,500,000 est. value
Harrisburg, PA

20 Dam Repairs at Various Locations in Western and Central Pennsylvania
Renovation
Bidding
$1,000,000 est. value
Harrisburg, PA 17105

Repair of Lake Swiftwater Dam
Renovation
Post-Bid
Henryville, PA 18332

Dam Rehabilitation - Construction - Hibernia Dam, Chester, PA
Results
$500,000 to $1,000,000 est. value
PA 19320

Dam Repairs - Promised Land Dam
Bidding
$25,000 to $50,000 est. value
Greentown, PA

Capitol Complex Central Plant Steam Tunnel Repairs - General Construction
Post-Bid
$500,000 to $600,000 est. value
Harrisburg, PA 17100

Sand Springs Dam D52-177 Replacement of Outlet Vault and Valve
Results
PA

Construct Temporary Causeway Susquehanna River Inflatable Dam at Sunbury
Bidding
$100,000 to $500,000 est. value
Northumberland, PA

Meadow Grounds Lake Dam
Results
$2,000,000 to $5,000,000 est. value
McConnellsburg, PA

3-Year Maintenance Contract for Neshaminy Flood Control Dams
Term Contract
Results
PA

Last Updated 03/01/2021 12:15 PM
Project Title

Multiple Locations Dam Rehabilitation Project

Physical Address View project details and contacts
City, State (County) PA   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Cloe Lake Dam, Hemlock Lake Dam, High Point Lake Dam, Kahle Lake Dam, and Virgin Run Lake Dam – Dam Rehabilitation Project. The scope of work includes, but is not limited to, evaluate all five dams to determine required spillway design flood, reconstruct dam/spillway, modify or reconstruct dam embankment slopes and drainage systems to provide continued fishing and boating opportunities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents