Similar Projects
Sun Communities Mobile Home Park
New Construction
Conception
Fort Collins, CO 80525

Westwood Subdivision Site Development
New Construction
Design
Thornton, CO 80602

Poudre Learning Center-Hall133, Riparian Restoration
Renovation
Design
Greeley, CO 80631

PKAA Chicago In Spring Mine Closure Project, 709N
Bidding
Denver, CO

Sky Ranch Cab Filing 4 Wet Utilities Project
Bidding
Lakewood, CO 80227

PKAA, Todd Gulch Mine Closure Project #653E
Post-Bid
Denver, CO

Pkaa, Fy2020, Mesa County Coal Refuse Project (572E)
Post-Bid
CO

PKAA, Monte Cristo Project Osm #715N
Results
Less than $97,740 est. value
Denver, CO

Boat Ramps and Two Parts of the Trail Extension
Results
Denver, CO

Avilla Prairie Center
New Construction
Construction
Brighton, CO 80601

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

Waterglen Pud Multi-Family
New Construction - 9,950 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Fort Collins, CO 80524

Berthoud Commons
New Construction
Pending Verification
Berthoud, CO 80513

Deer Creek Villas
New Construction
Design
Littleton, CO

PKAA Bald Mountain Mine Closure Project
Bidding
Denver, CO

Last Updated 02/01/2021 09:35 AM
Project Title

EC - LMDT Site Work Excavation

Physical Address View project details and contacts
City, State (County) Leadville, CO 80461   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work is located on north side of Leadville, Colorado in Lake County at Leadville Mine Drainage Tunnel Water Treatment Plant, 749 North Highway 91, Leadville, CO 80461. Work is an early site work contract to prepare work site for future water treatment plant construction project. Includes: Tree removal, as required, Site grubbing, remove and stabilize topsoil, Site excavation, grading, and gravel surfacing and Site perimeter fencing and gates modifications. The principal components of work to be performed include the following: 1. Tree removal, as required. 2. Site grubbing, remove and stabilize topsoil. 3. Site excavation, grading, and gravel surfacing. 4. Site perimeter fencing and gates modifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents