Similar Projects
(ICE-HSI) Backfill Project
New Construction, Renovation, Build-Out - 147,000 SF
Design
$55,000,000 to $65,000,000 est. value
New York, NY

Camp Buckner Phase 2
New Construction, Renovation - 30,000 SF
Design
$10,000,000 to $25,000,000 est. value
West Point, NY 10930

Remediate Mold and Renovate Chapel
Renovation - 4,500 SF
Bidding
$1,000,000 CJ est. value
Albany, NY 12208

RFQ Contractor- Repair Fired Doors
Renovation
Bidding
$25,000 CJ est. value
New York, NY 10468

RFQ Contractor - Build Community Living Center at Montrose Campus
New Construction, Infrastructure
Post-Bid
$16,500,000 CJ est. value
Montrose, NY 10548

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Camp Buckner Phase I, West Point, New York
Results
$10,000,000 to $25,000,000 est. value
West Point, NY

Various Small Construction Projects within the Boundaries of Great Lakes and Ohio River Divisions
Renovation, Addition, Demolition, Term Contract
Results
Less than $90,000,000 est. value
Chicago, IL - Louisville, KY - Detroit, MI - Allegany, Buffalo, NY - Nashville, TN - Huntington, WV

Renovate Operations Building 2A - Scotia, NY
Construction
$1,000,000 to $5,000,000 est. value
Scotia, NY 12302

Rehabilitate Office and Building Entrance - HVAC
Renovation, Infrastructure
Construction
$270,842 CJ est. value
Latham, NY 12110

RFQ Design - 620-22-105 Relocate Radiology to the Ground Floor of Building 3 (AE Services)
Renovation
Pending Verification
$5,000,000 CJ est. value
Montrose, NY 10548

Add Walls to Room E132, Building 1
Renovation
Design
$250,000 to $500,000 est. value
Rome, NY 13441

United States Merchant Marine Academy - Fulton - Gibbs Refurbishment
Renovation
Bidding
$500,000 CJ est. value
Great Neck, NY 11024

Watervliet Arsenal (WVA) Gillespie Gate Access Control Point (ACP)
Renovation, Alteration
Post-Bid
$15,000,000 to $20,000,000 est. value
Watervliet, NY

Niagara Falls Air Reserve Station Main Gate
New Construction
Results
$10,000,000 to $15,000,000 est. value
Niagara Falls, NY

Last Updated 03/31/2023 12:25 PM
Project Title

Behavioral Health & Patient Administration Alteration

Physical Address View project details and contacts
City, State (County) West Point, NY 10996   (Orange County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to (1) renovate, outfit, and transition the Allgood Clinic (Building 900B) to house the Behavioral Health Clinic and (2) renovate, outfit and transition 3rd floor space in the Keller Army Community Hospital (Building 900) to house the displaced Patient Administration Department (PAD) at the West Point Academy, New York. The preponderance of the work is converting existing spaces with new functions. The total GSF is 9,015. Work shall be accomplished in accordance with applicable federal and state codes and laws and with Unified Facilities Criteria (UFCs), Unified Facilities Guide Specifications (UFGS), and DHA-FE Personal Property Performance Criteria (PPPC) and other criteria and attachments referenced in this SOW. But not limited to, please review the statement of work for more information. Magnitude of Construction: $1M - $5M Prevailing Wages apply. Contract Duration = 120 days *All ProjNet RFIs were answered by the Government. *Scope summaries have been posted for the following trades: - Architectural Trades (includes finish schedule) - FF&E - Fire Suppression - Plumbing/Mechanical - Electrical - Comm/ESS

Details

9,015 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents