Similar Projects
Blue Water Express Wash
New Construction - 2,475 SF
Conception
$500,000 to $1,000,000 CJ est. value
Tallahassee, FL

Johnny Clean Car Wash
New Construction - 3,800 SF
Conception
$500,000 to $1,000,000 CJ est. value
Boca Raton, FL 33434

Subaru of Daytona
New Construction
Design
Daytona Beach, FL 32124

North Monroe Street Development
New Construction, Demolition - 1,645 SF
Design
$500,000 to $1,000,000 CJ est. value
Tallahassee, FL 32303

7-Eleven # 38859
New Construction - 7,508 SF
Bidding by Invitation
$2,100,000 est. value
Port Saint Lucie, FL 34983

7-Eleven #41149
New Construction
Bidding by Invitation
Orlando, FL 32833

229 Express Car Wash
New Construction - 4,352 SF
Sub-Bidding
$2,000,000 est. value
Port Saint Lucie, FL 34984

9200 Express Car Wash
New Construction - 3,689 SF
Sub-Bidding
$2,000,000 est. value
Port Saint Lucie, FL 34952

Tropical Chevrolet Expansion
New Construction, Renovation, Addition - 1,056 SF
Post-Bid
$10,000,000 CJ est. value
Miami Shores, FL 33138

Rocket Shine Car Wash
New Construction - 65,339 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Punta Gorda, FL 33950

Construction of a Covered Commercial Vehicle Wash Rack System at Fire Station 20
Results
$251,475 est. value
Sarasota, FL 34233

Parrish Storage 2
New Construction - 64,800 SF
Construction
$4,000,000 est. value
Parrish, FL 34219

Honda of Fort Myers
New Construction - 63,951 SF
Construction
$13,525,120 est. value
Fort Myers, FL

Woodie's Wash Shack Car Wash
New Construction
Conception
$900,000 est. value
Sarasota, FL 34243

Sporty's Express Car Wash
New Construction - 5,030 SF
Design
$1,000,000 to $5,000,000 CJ est. value
New Smyrna Beach, FL 32168

Last Updated 01/15/2019 09:19 AM
Project Title

Construction of Aircraft Wash Rack Facility

Physical Address View project details and contacts
City, State (County) Venice, FL 34284   (Sarasota County)
Category(s) Commercial
Sub-Category(s) Car Wash
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Includes a rigid pavement section of 290 SY of 6 inch portland cement concrete pavement and 320 SY of 4 inches recycled concrete aggregate base course P-219 for the aircraft wash pad. The project will include a flexible pavement section of 60 tons of new P-403 asphalt and 380 SY of 6 inches recycled concrete aggregate base course P-219 which will be used to tie-in the existing taxilanes to the new aircraft wash pad. The project will include 185 lf or 12 inch by 18 inch elliptical reinforced concrete pipe, 2 Type C inlets, 1 Type F inlet, a type 8 Manhole and a mitered end section for drainage improvements. The project will include a XERXES 1,000 gallon double wall oil/water separator or approved equal. The project will include a tap into the existing water main and shall provide a hose bib for potable water use for the aircraft wash rack. A ground mounted hose reel and 75 foot hose will be included for the project. The project will include an E-One Grinder Pump Station or approved equal and connection to the existing forcemain a, 2 foot by 2 foot utility box, 4 foot by 4 foot utility box for utility improvements. A wash rack card reader will be installed to monitor use of the aircraft wash rack. Three (3) electrical valve actuators will be used in the system. In the off position the electrical valve actuator will be in the closed position for the water line and the wastewater line to the oil/water separator and in the open position for storm pipe. When the card reader is activated the electrical valve actuator will be in the closed position for the storm pipe and in the open position for the water line and the wastewater line to the oil/water separator. This will allow the tenants to wash their aircrafts and will direct the runoff from the aircraft wash pad when in use to the existing forcemain. The project will include electrical tie-ins to the existing electrical service to provide power to the wash rack card reader, electrical valve actuators and the E-One Grinder Pump station. The project will include a conduit run from the wash rack card reader to the existing administration building which will be connected into the existing security system. The project will also include 940 sf of pavement markings, silt fence for erosion protection, 1,500 SY of sodding.
Details
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents