Project Title | Construction of Aircraft Wash Rack Facility |
Physical Address | View project details and contacts |
City, State (County) | Venice, FL 34284 (Sarasota County) |
Category(s) | Commercial |
Sub-Category(s) | Car Wash |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $300,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Includes a rigid pavement section of 290 SY of 6 inch portland cement concrete pavement and 320 SY of 4 inches recycled concrete aggregate base course P-219 for the aircraft wash pad. The project will include a flexible pavement section of 60 tons of new P-403 asphalt and 380 SY of 6 inches recycled concrete aggregate base course P-219 which will be used to tie-in the existing taxilanes to the new aircraft wash pad. The project will include 185 lf or 12 inch by 18 inch elliptical reinforced concrete pipe, 2 Type C inlets, 1 Type F inlet, a type 8 Manhole and a mitered end section for drainage improvements. The project will include a XERXES 1,000 gallon double wall oil/water separator or approved equal. The project will include a tap into the existing water main and shall provide a hose bib for potable water use for the aircraft wash rack. A ground mounted hose reel and 75 foot hose will be included for the project. The project will include an E-One Grinder Pump Station or approved equal and connection to the existing forcemain a, 2 foot by 2 foot utility box, 4 foot by 4 foot utility box for utility improvements. A wash rack card reader will be installed to monitor use of the aircraft wash rack. Three (3) electrical valve actuators will be used in the system. In the off position the electrical valve actuator will be in the closed position for the water line and the wastewater line to the oil/water separator and in the open position for storm pipe. When the card reader is activated the electrical valve actuator will be in the closed position for the storm pipe and in the open position for the water line and the wastewater line to the oil/water separator. This will allow the tenants to wash their aircrafts and will direct the runoff from the aircraft wash pad when in use to the existing forcemain. The project will include electrical tie-ins to the existing electrical service to provide power to the wash rack card reader, electrical valve actuators and the E-One Grinder Pump station. The project will include a conduit run from the wash rack card reader to the existing administration building which will be connected into the existing security system. The project will also include 940 sf of pavement markings, silt fence for erosion protection, 1,500 SY of sodding. | ||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |