Similar Projects
Alpine Elementary Air Handler and Controls Upgrade at Alpine Elementary.
Alteration
Bidding
Alpine, UT 84004

Highland Elementary Automatic Temperature Control(ATC) Upgrade
Alteration
Bidding
Highland, UT 84003

Ingersoll Rand Compressed Air System Purchase and Install
Post-Bid

RTU Replacement for Freedom Preparatory Academy
Alteration
Post-Bid
Provo, UT 84601

Pony Express ATC Replacement
Results
Eagle Mountain, UT

Utah State Hospital Rampton Building II Cooling System Replacement
Results
$1 to $746,000 est. value
Provo, UT 84606

Barratt Elementary Automatic Temperature Control(ATC) Upgrade
Alteration
Bidding
American Fork, UT 84003

DFCM Construction - UVU Browning Admin Building Air Handler Components Upgrades
Alteration
Results
$480,500 est. value
Orem, UT 84058

Bonneville Elementary Automatic Temperature Control(ATC) Upgrade
Alteration
Bidding
Orem, UT 84057

DFCM Construction - Pre Qualified Mechanical - UVU CS Bldg HVAC and Fire Damper Upgrades
Term Contract
Results
$395,000 est. value
Orem, UT 84058

Central Plants 1 and 2 Cooling Tower Repairs
Alteration
Results
$480,000 est. value
Orem, UT 84058

DFCM Construction - Pre Qualified Mechanical - DHS Orem District Juvenile Court HVAC Upgrades
Alteration
Results
$205,000 est. value
Orem, UT 84057

ATC Upgrades for Cedar Ridge, Deerfield, and Mount Mahogany Elementary Schools
Alteration
Results
Alpine, Cedar Hills, Pleasant Grove, UT 84062

Automatic Temperature Controls(ATC) Upgrade - Lehi Junior High School
Alteration
Results
Lehi, UT 84043

HVAC and Electrical Upgrade for Manila Elementary School
Alteration
Results
Pleasant Grove, UT 84062

Last Updated 03/03/2022 05:06 AM
Project Title

Dfcm Construction - Pre-Qualified Mechanical - Uvu Gunther Trades Building New Vav System

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the removal of dual duct boxes and replacement with new VAVs with reheat coils to serve the GT Bldg. Interior AHU’s shall be modified to support the new VAV system. The Base Bid shall include all modifications associated with mechanical room 330 interior air handler. The “Base Bid” shall include all work and materials associated with this project as outlined in the plans and specs.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents