Similar Projects
Lockwood Folly Park Facilities - Brunswick County
Infrastructure
Conception
$3,800,000 CJ est. value
Bolivia, NC 28422

Northwest District Park - Brunswick County
Infrastructure
Conception
$5,690,000 CJ est. value
Leland, NC 28451

Main, Powell and Gee Buildings Renovations
Renovation - 42,500 SF
Design
$42,000,000 est. value
Graham, NC 27253

Pump Station Replacements and Sanitary Sewer Improvements
Demolition, New Construction, Infrastructure
Design
$4,800,000 CJ est. value
Wadesboro, NC 28170

Anson Middle School - New School
New Construction, Infrastructure - 160,000 SF
Bidding
$52,688,803 CJ est. value
Wadesboro, NC 28170

Clay Street Infrastructure Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Mebane, NC 27302

Elon University - Hook Brannock Barney (HBB) Hall Renovations
Build-out, Renovation - 25,122 SF
Sub-Bidding
$1,000,000 CJ est. value
Elon, NC 27244

Ash - Waccamaw Multiuse Building - Brunswick County
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Ash, NC 28420

Early College Renovations With Birch Building
Renovation
Post-Bid
Asheville, NC 28801

Tall Glass of Water Project - Phase I
New Construction, Infrastructure
Results
$1,271,000 CJ est. value
Merry Hill, NC 27957

Community Center Site Improvements
Infrastructure
Results
$720,500 to $950,279 est. value
Saint James, NC

Building A Culinary Arts Renovation
Renovation
Construction
Graham, NC 27253

Biotechnology Center of Excellence
New Construction - 32,500 SF
Construction
Graham, NC

Oakcrest Subdivision
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Asheville, NC 28806

Sardis Road Apartments
New Construction, Infrastructure
Pending Verification
$112,000,000 CJ est. value
Asheville, NC 28806

Last Updated 12/28/2022 01:36 PM
Project Title

Nash Community College Veterinary Medical Technology Building

Physical Address View project details and contacts
City, State (County) Rocky Mount, NC 27804   (Nash County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,388,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

** As of November 10, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The Project includes the construction a 2,755 square foot single story building. Construction includes slab on grade, load and non-load bearing steel stud walls, steel framing, wood roof trusses and plywood decking, brick veneer, EIFS and standing seam metal roofing system. Interior partitions are steel stud with gypsum board. Construction includes plumbing, mechanical, electrical systems along with related site development. Bids will be received for Single Prime Contracts. All proposals shall be lump sum . Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute such bonds, conditioned that the surety will, upon demand forthwith make payment to the obligee upon said bond if the bidder fails to execute the contract in accordance with the bid bond. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A Performance Bond and a Payment Bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days. The owner reserves the right to reject any or all bids and to waive informalities.

Details

1 Story Above Grade, 2,755 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents