Similar Projects
Wemsing Avenue - City Of Effingham
Infrastructure
Conception
$300,000 est. value
Effingham, IL 62401

East Evergreen Roadway Improvement - City Of Effingham
Infrastructure
Conception
$850,000 est. value
Effingham, IL 62401

Construct Concrete Courtyard and Rainwater Drainage
Infrastructure
Bidding
$550,000 CJ est. value
Effingham, IL 62401

Demolish and Remove Old Gazebo and Construct New Gazebo for Effingham County
Infrastructure
Bidding
$290,000 CJ est. value
Effingham, IL 62401

Cleaning and Painting 8 Bridges on I-57
Post-Bid

Bituminous Material
Post-Bid
Effingham, IL

2 Miles of Crack and Joint Sealing on I-57/70 from the Little Wabash River to Us 40 and 2.75 Miles on i-57/70 from 4th Street Overpass to the North Tri- Level Including Exit and Entrance Ramps
Results
IL

1.56 Miles of Partial Depth Resurfacing at Various Locations on US 40, IL 32 and IL 33
Results

WestDale Project
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Effingham, IL 62401

Ford Avenue Extension Phase IB - City Of Effingham
Infrastructure
Conception
$1,400,000 est. value
Effingham, IL 62401

Hvac And Structural Weatherization
Term Contract
Post-Bid
Effingham, Mount Carmel, IL 62401

Four Seasons Reconstruction
Results
Less than $142,221 est. value
Effingham, IL

Fifth And Douglas Reconstruction - City of Effingham
Infrastructure
Conception
$475,000 est. value
Effingham, IL 62401

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Temple Avenue Resurfacing
Results
Less than $430,777 est. value
Effingham, IL 62401

Last Updated 09/07/2022 09:37 AM
Project Title

Pavement Patching - 2022

Physical Address View project details and contacts
City, State (County) Effingham, IL 62401   (Effingham County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $915,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work is officially known as Pavement Patching-2022 for the City of Effingham, Effingham, Illinois. The project shall consist of the removal and replacement of pavement at the designated locations shown herein and other miscellaneous work. The Contract Documents, consisting of the Notice to Contractors, Special Provisions, Contract, Proposal, Notice of Award, Notice to Proceed, Change Order, Specifications, Addenda may be examined at the following locations: Proposals must be submitted to the City Engineer's Office and shall be enclosed in a separate and sealed envelope endorsed "Pavement Patching-2022". Each proposal shall contain the name of every person or firm interested in the same and shall be accompanied by a bid bond, bank cashier's check, bank draft or certified check for not less than five (5) percent of the amount of the bid. A surety bond for the full amount of the award is required. Failure on the part of the contractor to deliver the materials within the time specified or to do the work as specified herein will be considered just cause to forfeit the surety as provided in Article 108.10 of the State of Illinois Standard Specifications for Road and Bridge Construction, adopted January 1, 2022. The City of Effingham reserves the right to reject any or all bids, waive or not waive any informality in the bids, and to accept any bid which it deems most favorable to the City. It is agreed that this bid may not be withdrawn for a period of 45 days from opening thereof or it will be subject to forfeit the 5% Bid Bond provided with the bid. It is anticipated that a Notice of Award of a contract will be issued within 30-to-45 days of the date bids are received and that a Notice to Proceed will be issued within 10 days of the date of the Notice of Award if contractor provides proper insurance and bonding in a timely manner. Work on this project is subject to the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1- 12). Contractor shall not pay less than prevailing wages to all laborers, workman, and mechanics or any other trade performing work under this contract and shall comply with the requirements of the act stated above. Prevailing Wages, as determined by the Illinois Department of Labor and the current prevailing wages in effect at the time of the work, as established by the City of Effingham. The submission of monthly certified payrolls to the City of Effingham will be required. Work on this project is subject to the Illinois Substance Abuse Prevention on Public Works Project Act as enacted by P.A. 95-0635.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents