Similar Projects
2022 Capital Improvements - Jamestown Public Schools District
New Construction, Renovation, Infrastructure
Design
$86,500,000 CJ est. value
Jamestown, NY 14701

2022 Capital Improvements - Jamestown Public Schools District
New Construction, Renovation, Infrastructure
Design
$86,500,000 CJ est. value
Jamestown, NY 14701

Forestville Central School District (CSD) Capital Outlay Project 2022 / 2023
Renovation
Bidding
$75,000 CJ est. value
Forestville, NY 14062

Jamestown Public Schools Capital Project Phase 1 at Fletcher Elementary, Technical Academy and Bus Garage - BP-01 Site Work
Infrastructure
Bidding
$300,000 CJ est. value
Jamestown, NY 14701

Silver Creek CSD
Renovation
Post-Bid
$680,000 CJ est. value
Silver Creek, NY 14136

Silver Creek CSD
Renovation
Post-Bid
$680,000 CJ est. value
Silver Creek, NY 14136

Persell Middle School - Secure Vestibule and Office Relocation
Renovation
Results
$180,000 est. value
Jamestown, NY 14701

2021 Mini Project Reconstruction at Westfield Academy
Renovation
Results
Westfield, NY 14787

Bemus Point CSD 2019 Capital Improvements Project
Construction
Less than $1,900,000 est. value
Bemus Point, NY 14712

Frewsburg 2021 Capital Improvement Project
Renovation
Bidding
$300,000 CJ est. value
Frewsburg, NY 14738

Silver Creek CSD 2022 CIP
Renovation
Post-Bid
$152,000 CJ est. value
Silver Creek, NY 14136

Silver Creek CSD 2021-2022 Capital Outlay Exception Project
Renovation
Results
Less than $100,000 est. value
Silver Creek, NY 14136

2022-2023 Capital Outlay Project
Renovation
Bidding
$195,000 CJ est. value
Dunkirk, NY 14048

Sherman CSD Capital Outlay Project 2021-2022
Renovation
Results
Less than $100,000 est. value
Sherman, NY 14781

Chautauqua Lake CSD 2020 Capital Improvements Project - Phase 2
Addition - 311,889 SF
Results
$275,000 to $6,000,000 est. value
Mayville, NY 14757

Last Updated 12/12/2022 03:10 PM
Project Title

Capital Improvement 2021 - Southwestern Central School District

Physical Address View project details and contacts
City, State (County) Jamestown, NY 14701   (Chautauqua County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $18,237,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed Capital Improvements Project, 2021 consisting of the partial reconstruction and renovation of, and the construction of improvements, upgrades and additions to various District buildings and facilities. Proposed building space construction and reconstruction work at the High School is anticipated to include kitchen and cafeteria upgrades including renovations, a cafeteria addition and outdoor patio, and food service equipment; a new elevator and shaft for compliance with stretcher accessibility requirements; and locker room changing booths. At the Middle School, existing space construction and reconstruction work is anticipated to include the development of a secure vestibule, a multipurpose space with outdoor patio, District office space, and an upgraded kitchen. Other Middle School renovations are anticipated to include improvements to restrooms and the main office, and the installation of locker room changing booths. Elementary School renovations are anticipated to include door security upgrades; gymnasium flooring, wall, and ceiling finishes, wall pads, and adjustable hardware for existing backboards; cabinetry; and minor floor tile and restroom partitions upgrades. Exterior building envelope work at the High School is anticipated to include new roofing over selected areas and masonry and other exterior upgrades such as work on openings, lintels, fascia, and canopies. Other proposed exterior work is anticipated to include new Middle School windows and various Elementary School upgrades such as doors, a reconstructed chimney cap, and overhead soffits. Multiple upgrades to building systems, including mechanical, electrical, plumbing and HVAC improvements, are proposed at each school and include boilers and boiler pumps, unit ventilators, cooling equipment, emergency power, and duct cleaning at the High School; unit ventilators and surge protection at the Middle School; pool HVAC, plumbing, and filtration upgrades, heat pumps, locker room shower units, classroom sinks, and a water softener at the Elementary School; and electrical panel and related upgrades at the Bus Garage. Proposed site work is anticipated to include new synthetic turf and infill and LED lighting at the stadium sports field, underdrainage at the Middle School soccer field, and reconstructed stairs and sidewalks at the High School. If the budget allows after receiving construction bids, or if other items are identified, additional similar renovations, upgrades, and improvements could be undertaken, possibly including items such as a stadium synthetic turf field underdrain system, stadium press box upgrades, Elementary School boilers and generator, an addition to the High School kitchen, and additional exterior wall reconstruction. As of December 13, 2021, this project is in the conceptual phase. An architect has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to November 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents