Similar Projects
2024 Bond - Central School District 301
New Construction, Infrastructure, Renovation
Conception
$195,000,000 CJ est. value
Sycamore, IL 60178

First United Methodist Church
New Construction, Infrastructure - 10,986 SF
Design
$600,000 CJ est. value
Dekalb, IL 60115

RFP-Engineering Services -2024 STU Project
Infrastructure
Bidding
$656,250 CJ est. value
Sycamore, IL 60178

Mill 2 Hot-Mix Asphalt, Pavement Class D Patch, Sidewalk
Infrastructure
Bidding
$2,000,000 CJ est. value
Cortland, IL 60112

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Milling and Resurfacing on IL 38. Some ADA Work and Traffic Signal Improvements Are Proposed
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Dekalb, IL 60115

2022 Streets Program Bid Package 2
Infrastructure
Results
$814,931 CJ est. value
Dekalb, IL 60115

2022 Streets Program Bid Package 4
Infrastructure
Results
$499,071 CJ est. value
Dekalb, IL 60115

Boxed Up Self Storage
Build-Out - 20,000 SF
Pending Verification
Dekalb, IL 60115

Construct Northern Illinois Center for Community Sustainability - Northern Illinois University
New Construction, Infrastructure - 30,000 SF
Pending Verification
$24,000,000 CJ est. value
Dekalb, IL 60115

Site Improvements Project at Hinckley-Big Rock High School
Infrastructure
Post-Bid
$400,000 est. value
Hinckley, IL 60520

Hot-mix Asphalt Milling
Infrastructure
Results
$67,138 CJ est. value
Shabbona, IL 60550

McDonald's Remodel / DeKalb
Infrastructure, Build-out
Pending Verification
$1,000,000 CJ est. value
Dekalb, IL 60115

Sandwich Bus Barn
New Construction
Post-Bid
$149,000 est. value
Sandwich, IL

Sidewalk Removal and Replacement
Infrastructure
Results
$46,989 CJ est. value
Shabbona, IL 60550

Last Updated 06/16/2023 01:13 PM
Project Title

Sycamore Road Self-Storage Facility

Physical Address View project details and contacts
City, State (County) Dekalb, IL 60115   (DeKalb County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected December 2021
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The square footage of the 189-unit facility has not been announced. As of November 19, 2021, this project is working to obtain final approvals and permits from the City of Dekalb. Information regarding an architect or general contractor has not been disclosed. Although there is not a firm timeline, construction could begin in late-2021.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents