Similar Projects
Multimodal Improvements 2022/23 - City of Eureka
Infrastructure
Conception
$3,936,420 est. value
Eureka, CA

C Street Bike Boulevard - City of Eureka
Infrastructure
Conception
Less than $1,939,000 est. value
Eureka, CA 95501

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Major Damage Restoration
Infrastructure
Design
$3,360,000 est. value
Willow Creek, CA 95573

Road Maintenance on Bald Hills Road
Infrastructure
Bidding
$873,550 est. value
Orick, CA 95555

Trinidad Fire Station - Paving Services
Infrastructure
Post-Bid
Trinidad, CA 95570

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Bald Hills Road Resurfacing Project
Infrastructure
Results
Hoopa, CA 95546

RHMA-G and HMA
Infrastructure
Results
$26,000,000 est. value
CA

Elk River Interpretive Center - City of Eureka
Alteration
Conception
$3,500,000 est. value
Eureka, CA

Curve Improvement
Infrastructure
Design
$7,290,000 est. value
Eureka, CA

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Precoated Aggregate, Replace AC Surfacing, and Asphalt-Rubber Binder
Infrastructure
Results
$2,250,000 est. value
CA

Bay to Zoo Trail - City of Eureka
Infrastructure
Conception
$5,973,000 est. value
Eureka, CA 95501

Curve Improvement
Alteration
Design
$13,155,000 est. value
Blue Lake, CA 95525

Reported 07/15/2022 04:50 PM
Project Title

Reconstruct Curb Ramps and Sidewalk

Physical Address View project details and contacts
City, State (County) Eureka, CA 95503   (Humboldt County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $6,034,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct Curb Ramps and Sidewalk Project ID : 0116000186 Bkpm: 77.3 Ahpm : 78.1 Proposed Advertise Date : 07/13/2022 As of July 08, 2022, the project is in Final Planning status. Anticipated construction year is 2022. CADOT - Reconstruct Curb Ramps and Sidewalk *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents