Similar Projects
McNair Hall Canopy Replacement
Alteration
Bidding
Greensboro, NC 27401

Reroof, Clean Gutters, Install Gutter Guards, and New Downspout Drainage at The Oaks
Infrastructure, Alteration
Bidding
Greensboro, NC

Roofing Repairs and Maintenance
Post-Bid
Greensboro, NC 27401

Roofing MACC
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Gtcc - Davis Aviation Center Roof Coating
Post-Bid
Greensboro, NC

Auxiliary Gym Roof Replacement for Dudley High School
Results
Greensboro, NC 27401

Roofing Repair and Maintenance
Post-Bid

2020 Roof Replacement - Welborn Middle School
Results
$274,000 est. value
High Point, NC 27265

Roof Replacement
Alteration
Post-Bid
Greensboro, NC

Roof Replacement - HPHA Main Office
Results
High Point, NC 27260

Johnston Street Global Roof Replacement
Alteration
Post-Bid
High Point, NC 27262

Astor Dowdy Towers Roof Replacement
Results
High Point, NC

Roof Replacement for Oakview Elementary School
Alteration
Post-Bid
High Point, NC 27265

Last Updated 10/19/2021 01:16 PM
Project Title

Gym Roof Replacement

Physical Address View project details and contacts
City, State (County) Oak Ridge, NC 27310   (Guilford County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Removal of the existing spray foam and built-up roofing system(s) down to the tectum decking. Roof size is approximately 9,000 sq ft 2. The roofing system insulation shall be a isocyanurate insulation with a ½” primed- gypsum overlayment board, sloped to drain from the center to new perimeter gutters. 3. The replacement membrane assembly consists of the application of a fully-adhered PVC-KEE single-ply membrane. Scope of Work includes installation of a new perimeter edge metal and prefinished gutters. 4. An Alternate for a two ply modified membrane on the same insulation/cover board will be considered 5. Roofing membrane installation shall be require on-going inspections by the membrane manufacturer during the installation process and will be eligible to receive a 20 year NDL material and labor warranty. 6. Project start date will be determined upon verification of material delivery 7. The resulting contract will be to furnish all labor, supervision, materials and equipment necessary to perform the work as shown on the plans and described in the project specifications.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents