Similar Projects
Oslo Levee Repair
Design
$25,000 to $10,000 est. value
Oslo, MN

Montevideo Stage 3B Flood Risk Management Construction
Bidding
$1,000,000 to $5,000,000 est. value
Montevideo, MN

CR 61 Box Culvert Installation
Bidding
MN

NLH Pond Kettle Repair
Post-Bid
New London, MN 56273

HDPE Pipe & Directional Boring
New Construction
Post-Bid
Minneapolis, MN 55401

2020 Northeast Drainage Area Improvements
Results
$1,500,000 est. value
Lino Lakes, MN 55104

2020 Pond Maintenance
Results
Golden Valley, MN 55427

Karth Lake Runoff Control
Bidding
$171,000 to $180,000 est. value
Arden Hills, MN

Bluff 25 Culvert Replacement
Post-Bid
Eden Prairie, MN

2020 Pond Cleaning
Renovation
Results
$110,000 est. value
West Saint Paul, MN 55118

Faribault County Ditch No. 25A
Bidding
$125,000 est. value
MN

DNR1 Eckvoll WMA Culvert Installation
Post-Bid
Gatzke, MN 56724

CSAH 34 Reconstruction
Results
Fergus Falls, MN 56537

TH 65 East Service Road
Bidding
$5,000,000 est. value
East Bethel, MN

Butler Road - Culvert Replacement
Post-Bid
MN

Last Updated 01/19/2021 03:52 AM
Project Title

Interstate State Park Large and Small Scale Rock Removal

Physical Address View project details and contacts
City, State (County) Taylors Falls, MN   (Chisago County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project site is located within Interstate State Park south of the City of Taylor Falls along the western bank of the Saint Croix River. Proposed rock outcrop area requiring repair (scaling and bolting) is approximately 100 lineal feet. The following is a general guide to the items of work. It should not be construed as a detailed list of work included in the contract. Scaling Crew Mobilization/ Demobilization LS 1 Three Person Scaling Crew - Working Rate HR 60 Rock Removal and Disposal LS 1 Rock Bolting Mobilization LS 1 Rock Bolting - 0 to 120 Feet LF 105

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents