Similar Projects
Gatehouse Window Replacement, Littleville Lake, Huntington, MA
Design
Huntington, MA

Northampton Health Department Flooring
Alteration
Bidding
Northampton, MA

Aluminum Window Repair
Post-Bid
Amherst, MA

Hardwood Synthetic Sports Flooring
Post-Bid

Mackimmie and Prince ADA Restrooms and Closet Renovations - Sub-Bids
Results
Less than $550,000 est. value
Amherst, MA

Sliding Door Replacement, Hamblin Court 667-1 & Hillside Terrace 667-1A
Results
Less than $59,830 est. value
Huntington, MA

Carpet and Flooring Replacement
Post-Bid
Less than $183,393 est. value
Northampton, MA

Recreation Center - Recoat Wood Floors
Results
Less than $70,000 est. value
Amherst, MA 01003

Overhead Door Maintenance Services Statewide
Post-Bid
Less than $200,000 est. value

Update Existing Door Hardware
Results
Less than $18,146 est. value
South Hadley, MA

Community Action Pioneer Valley Removal And Replacement Of Windows
Post-Bid
Northampton, MA 01060

Goessmann, Exterior Window Paint - Sub-Bids
Results
Less than $150,000 est. value
Amherst, MA

Stair Repairs
Post-Bid
Less than $45,000 est. value
Belchertown, MA 01007

Window Replacement Newton Manor 667-1
Results
Less than $112,280 est. value
South Hadley, MA 01075

ADA Doors at Smith Tech
Alteration
Post-Bid
Northampton, MA

Last Updated 08/18/2021 03:19 PM
Project Title

Floors, Walls and Doors Repair Project

Physical Address View project details and contacts
City, State (County) Belchertown, MA   (Hampshire County)
Category(s) Single Trades
Sub-Category(s) Flooring, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $49,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: 1. Replace fifteen ( 15 ) existing interior doors, frames, and hardware with new (see door schedule). Provide and install new kickplates (12" high) both sides of new doors. 2. Replace existing VCT flooring with new at wall openings and doors where shown on drawings. Area to be replaced to be width of opening/door x thickness of wall/depth of frame. 3. Provide and install new threshold transition strip at shower room in "Bathroom-106" (approx. 39" wide). Transition strip to be Schluter Reno-T (1" wide).

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents