Similar Projects
CIP Valve Replacement
Post-Bid
Palm Bay, FL

Prequalification of Companies to Bid Construction Services for the Pineda Causeway Water Transmission Mains Project
Post-Bid
Melbourne, FL 32901

Brevard County Utility Services Department Underground Utility Contractor Services Fiscal Year (FY) 2020
Term Contract
Results
Viera, FL 32940

Columbia Lane - Brandywine Lane Water Main Project
Results
$1,200,000 est. value
West Melbourne, FL 32904

Gate Valves
Post-Bid
Palm Bay, FL

Thurm Boulevard Force Main Replacement
Results
Cape Canaveral, FL 32920

Sherwood Park Water Quality Enhancements
Results
$1,667,834 est. value
Melbourne, FL 32901

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Subaqueous Crossings Pipeline Repair Services - FEMA
Term Contract
Results
Melbourne, FL 32901

Fire Station #5 Fireline
Results
Palm Bay, FL 32909

Continuous Contract for Water, Wastewater and Stormwater Repairs for Emergency Work
Term Contract
Results
Melbourne, FL 32901

General Contractor - Utility Systems
Term Contract
Results
Cocoa, FL 32922

Jupiter Bridge C-1 Abandoned Water Main Removal
Results
Less than $30,000 est. value
Palm Bay, FL

North Courtenay Parkway Force Main and Reuse Extension, Phase 3
Results
$1,219,042 est. value
Merritt Island, FL 32953

South Carpenter Water Main Extension
Results
Less than $517,000 est. value
Titusville, FL 32780

Last Updated 11/28/2020 10:25 AM
Project Title

Pipe Connection To Fire Station Pond

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32905   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $365,878
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of a 48 inch drainage pipe located adjacent to the St Johns Heritage Parkway in the City of Palm Bay. The project shall include all incidentals required to complete the installation of the 48 inch plastic culvert pipe and the two manhole boxes identified in the attached design plans. The new pipe will connect to an existing 48” pipe under the Parkway. A pre-construction video shall be performed by the contractor to document the existing condition of 48 inch pipe and shall be used for dispute resolution of any existing damage.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents