Similar Projects
Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

HVAC Repairs and Maintenance
Term Contract
Sub-Bidding
Detroit, MI 48202

Emergency Restoration Services
Term Contract, Alteration
Post-Bid
MI

Horizontal Unit Ventilator
Alteration
Post-Bid
Clio, MI 48420

Upgrade to Potable Water Risers Construction
Alteration
Results
$1,000,000 to $5,000,000 est. value
Iron Mountain, MI 49801

AC and Lighting for Eberwhite
Alteration
Results
Ann Arbor, MI 48103

HVAC Equipment
Alteration
Post-Bid
Yale, MI 48097

TCF - Kitchen MAU and Library AC
Alteration
Results
Lapeer, MI 48446

Clio High School Area F Air Conditioning Renovation
Alteration
Post-Bid
Clio, MI

Surline MS Two-Story HVAC Improvements and Rose City Elementary DDC Controls
Alteration
Results
West Branch, MI

Standish Community Center RTU Replacement
Alteration
Post-Bid
Standish, MI

Stevenson High School PAC AHU Upgrade
Alteration
Results
Sterling Heights, MI 48313

HVAC Preventative Maintenance
Infrastructure
Post-Bid
Watersmeet, MI

Middle School/High School Unit Ventilator Replacement Project
Alteration
Results
Hartford, MI

HVAC Replacement at Bowen Branch Library
Alteration
Post-Bid
Detroit, MI 48216

Last Updated 08/11/2023 10:01 AM
Project Title

Junior/Senior High School Boiler Replacement Escanaba Area Public Schools

Physical Address View project details and contacts
City, State (County) Escanaba, MI 49829   (Delta County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Boiler replacement Work including Demolition and replacement of an existing boiler, near boiler piping, pumps, controls and associated items The owner reserves the right to change the schedule or terminate the entire procurement process at any time. Questions: Direct all questions to the office of the Engineer: Dynamic Design Group, inc., (906) 786-3300 or to Matt Wickstrom of Fox Valley MEP - (920) 370-7070 (cell phone); e-mail mattw@fvmep.com Bid Security: Bidders will be required to provide Bid Security in the form of a Certified Check or Bid Bond payable to the Owner for not less than 5% of their total bid amount. The project will require the Prime contractor to obtain a performance and payment bond in the amount to cover the total contract. The Owner reserves the right to accept or reject any or all bids.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents