Similar Projects
Shared-Use Paths, and Sidewalks
Infrastructure
Conception
Moline, IL

Replace Waterline
Infrastructure
Design
$900,000 est. value
Centralia, IL 62801

Mason Court Sidewalk Replacement
Infrastructure
Bidding
De Kalb, IL

Brownell ES-Carter ES-King ES-Sherwood ES-ADA
Infrastructure
Bidding
Chicago, IL

Lot Repairs at Champaign Sign Shop
Post-Bid
Champaign, IL 61820

A/E Services For Repair/Resurface Roadways And Sidewalks
Renovation
Post-Bid
Less than $6,600,000 est. value
Springfield, IL 62794

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

2020 Sanitary & Water Structure Rehabilitation
Renovation
Results
Lincolnshire, IL 60069

Precoated Galvanized Corrugated Steel Pipe
Post-Bid
Edwardsville, IL

Construct A Pedestrian Underpass From Burlington Avenue, Through the BNSF Railway Embankment
Results
Western Springs, IL 60558

Culvert Repairs
Post-Bid
Palos Hills, IL 60465

(3.10 Mile) Overlay, Pedestrian Ramp New Hma Shoulders On Il- 173 Shoulders On Il- 173 From Green Bay Rd To Sheridan Rd . Drainage Improvement Between Hebron Ave. And Galilee Ave. In The City Of Zion.
Results
Zion, IL

Burlington Highlands Drainage Improvements
Post-Bid
Downers Grove, IL

Route 31 Water Main Relocation - Phase 2
Results
$1,000,000 to $2,000,000 est. value
South Elgin, IL 60177

Corrugated Steel Culverts Furnished To County Highway
Post-Bid
Shelbyville, IL

Last Updated 10/04/2021 05:49 PM
Project Title

Colden Street Drainage Basin Improvements

Physical Address View project details and contacts
City, State (County) Polo, IL 61064   (Ogle County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $509,633
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of approximately 5,800 feet of storm sewer in sizes ranging from 12” to 84” and the associated drainage structures. Construction of approximately 1,700 feet of sanitary sewer in sizes ranging from 8” to 18” and the associated manholes and services connections. Construction of approximately 900 feet of water mains in sizes ranging from 4” to 10” and the associated fittings, hydrants, and service connections. The construction of surface restoration; including concrete sidewalks and driveways, concrete curbs and gutters, and turf restoration.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents