Similar Projects
HVAC Installation
Post-Bid
Millington, TN 38053

Vehicle Exhaust Removal Systems
Post-Bid
Collierville, TN 38017

Fogelman Executive Building Upgrades HVAC Controls
Results
Memphis, TN 38152

Winchester Elementary School HVAC Replacement
Term Contract
Results
Memphis, TN 38116

Clement, Mitchell, and Theatre HVAC Updates
Construction
$6,440,000 est. value
Memphis, TN

Boiler Facility DA Tank Alarms and Level Controls
Post-Bid
Memphis, TN 38104

Morton Filter Valve Replacement
Results
Memphis, TN 38128

Public Works Shop Building Heating and Ventilation Unit
Post-Bid
Arlington, TN 38002

Aerator Maintenance
Term Contract
Results
Memphis, TN 37501

United States Postal Service - HVAC Upgrades
Post-Bid
Less than $6,400,000 est. value
Memphis, TN 38136

Pink Palace Museum-HVAC
Results
$580,000 est. value
Memphis, TN 38111

HVAC Installations at West Collierville Middle School
Post-Bid
Collierville, TN 38017

Kingsbury Middle School/High School HVAC Replacement
Term Contract
Results
Memphis, TN 38122

Hot Water Heater Replacement
Post-Bid
Collierville, TN 38017

East Shelby Library HVAC Control System and Components
Results
Memphis, TN 38125

Reported 01/19/2022 12:00 AM
Project Title

DIDD West TN Water Treatment

Physical Address View project details and contacts
City, State (County) Arlington, TN 38002   (Shelby County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This contract is for water treatment services for the Department of Intellectual and Developmental Disabilities. Contractor shall provide total coverage service for water treatment to hot water boiler(s), cooling tower(s), chiller condenser(s) and accessories, and to hot/chill water loop system. Services shall include cost of chemicals, supplies, treatment, testing, inspection, trip charges, labor, emergency and non-emergency service and any equipment needed to meter and inject chemicals into the systems being treated. Contract Term: five years.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents