Similar Projects
Last Updated | 02/13/2023 07:37 AM |
Project Title | Ash Street LMIG |
Physical Address | View project details and contacts |
City, State (County) | Springfield, GA 31329 (Effingham County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $199,351 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | No bid may be withdrawn after the closing time for the receipt of bids for a period of thirty (30) days. The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Resurfacing approximately 1 mile of Ash Street with asphalt. Contractor shall also provide milling, bituminous tack coat, striping, and traffic control. Time allotted for completion of work is sixty (60) calendar days. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. Owner reserves the right to reject any or all Bids and to waive informalities, including without limitation, the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |