Similar Projects
Fordham Landing - Master Plan
New Construction - 1,530,000 SF
Conception
$3,500,000,000 est. value
University Heights, NY

Fun City Trampoline Park
Renovation - 7,000 SF
Bidding
Rochester, NY 14624

2021-2022 Athletic Field Reconstruction - Jericho Middle School/High School
New Construction
Bidding
Glen Head, NY 11545

Athletic Training Suite Renovation at SUNY Cortland
Renovation
Post-Bid
Less than $900,000 est. value
Cortland, NY 13045

Athletic Field Alterations
Post-Bid
Brockport, NY

Construction of an Athletic Field and Facilities for the Fancher-Davidge Park Expansion
Results
Middletown, NY 10940

Athletic Field Alterations
Renovation
Results
Brockport, NY 14420

12th Rock Ministries Indoor Sports Complex
New Construction - 104,000 SF
Construction
$12,000,000 to $15,000,000 est. value
Middletown, NY 10940

Phillips Mixed Use Development
New Construction - 63,200 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Altamont, NY 12009

Youth Study Basketball Training Facility
New Construction
Pending Verification
New Rochelle, NY 10805

X-Golf at Samanea New York Mall
Build-Out - 6,300 SF
Pending Verification
Westbury, NY 11590

RIT - New Turf Lacrosse/Soccer Field
Renovation
Bidding
Rochester, NY 14623

Ensley Facility Overhead Door Relocation
Renovation
Post-Bid
Syracuse, NY 13210

Renovate Field House at SUNY Plattsburgh
Renovation
Results
$2,500,000 to $5,000,000 est. value
Plattsburgh, NY 12901

Marist College McCann Center Addition Phase II
Renovation, Addition - 64,000 SF
Construction
$24,000,000 est. value
Poughkeepsie, NY 12603

Reported 09/20/2021 08:27 AM
Project Title

Speed Skating Oval Lean-Tos and Log Siding Contract

Physical Address View project details and contacts
City, State (County) Lake Placid, NY   (Essex County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value $35,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the Contract shall include: the manufacturing, supply, delivery and all labor, tools, equipment, materials, temporary facilities for the site erection of three (3) 12 ft x 18 ft lean-tos and log siding for one (1) 12 ft x 20 ft x 8 ft high framed building (including 10% waste). The lean-tos shall be manufactured off site and then delivered to the project site and re-assembled as required. All foundations, roof coverings and other finishes shall be provided by others. The siding shall be delivered to the site and unloaded. Installation is by others. The Contract shall include on-site representation and full coordination with the General Contractor-of-Record. The Bid shall include FOB Destination to the project site. All labor on the project site shall be subject to NYS Prevailing Wage Rates.

Details

Athletic Facility, Renovation.
Division 01 - General Requirements, Other Facility Construction Performance Requirements, Special Construction Performance Requirements.
Division 13 - Special Construction, Operation and Maintenance of Special Construction, Schedules for Special Construction, Athletic and Recreational Special Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents