Similar Projects
Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

2021 Cold-In-Place Asphalt Recycling
Post-Bid
Manitowoc, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Elkhart Lake - Kiel, South County Line - STH 32/57; Plymouth - Kiel, Suhrke Road - North County Line
Results
Elkhart Lake, Kiel, WI 53042

Portland Cement Concrete Road Reconstruction
Post-Bid
Two Rivers, WI 54241

Manitowoc - Green Bay, SCl - NCl
Results
Green Bay, Manitowoc, WI 54220

Hot Mix Paving
Post-Bid
Reedsville, WI 54230

Chilton - Valders, STH 67 - Roosevelt Street
Results
Chilton, Valders, WI 53014

2021 South Fifth Avenue Utility and Street Improvements, a Local Road Improvement Project
Post-Bid
Less than $300,000 est. value
Saint Nazianz, WI 54232

2021 Road Improvements (TRID)
Results
Less than $480,000 est. value
Two Creeks, WI

Pavement Repair
Post-Bid
Cleveland, WI 53015

2021 Street, Parking and Trail Improvements
Results
$115,000 est. value
Kiel, WI 53042

Pulverizing Chip Sealing
Post-Bid
WI

2021 Concrete Paving I and Concrete Slab Replacement
Results
Manitowoc, WI

Hot Mix Resurfacing (Overlay) on Asphalt Pavement of Wagon Wheel Road
Post-Bid
Manitowoc, WI 54220

Reported 06/15/2021 12:00 AM
Project Title

Chip Seal Surfacing with 3/8” Granite

Physical Address View project details and contacts
City, State (County) Cleveland, WI   (Manitowoc County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

153rd St., from 225th Ave. to gravel, 1.15 mile 190th St., from Hwy. 64 to Co. E, 1.5 miles 205th St., from Hwy. 64 corner to 190th Ave., 1 mile 190th Ave., from 205th St. to culvert, .1 mile 220th St., from Hwy. Z to gravel, .8 mile 230th St., from Hwy. 64 to Co. Z,1 mile Crack Filling: 205th St., from Hwy. 64 to Co. Z, approx. 1 mile

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents