Similar Projects
Terran Orbital Satellite & Space Vehicle Manufacturing Facility
New Construction - 660,000 SF
Conception
$250,000,000 to $300,000,000 est. value
Cape Canaveral, Titusville, FL

Space Perspective Manufacturing Bldg
New Construction - 49,000 SF
Conception
$38,000,000 est. value
Titusville, FL 32780

Lockheed Martin
New Construction, Renovation - 230,993 SF
Design
Titusville, FL

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Viera Booster Station Chloramination Improvements
Renovation, Infrastructure
Bidding
$590,000 CJ est. value
Melbourne, FL 32940

Dredged Material Management Area BV-4B Construction
Infrastructure
Bidding
$2,000,000 CJ est. value
Mims, FL 32796

FPL Cocoa Service Center Paving Improvements
Alteration
Post-Bid
Cocoa, FL 32922

Starbucks / Melbourne
Demolition, New Construction, Infrastructure - 2,503 SF
Post-Bid
$762,000 CJ est. value
Melbourne, FL 32901

Pineapple Complete Streets Project
Results
$1,119,730 est. value
Melbourne, FL 32935

Front Street Complete Streets Project
Results
Melbourne, FL 32901

Titusville Point - Site Development
New Construction
Construction
Titusville, FL 32780

Element by Marriott / Melbourne
New Construction, Infrastructure - 118,930 SF
Construction
$36,000,000 CJ est. value
Melbourne, FL 32903

Dark Storm Industries Headquarters and Manufacturing Facility
New Construction
Pending Verification
$3,200,000 est. value
Titusville, FL 32780

Dark Storm Manufacturing Building
New Construction - 24,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Titusville, FL 32780

Commodore Boulevard Widening - 64119 - City of Melbourne
Infrastructure
Conception
$2,250,000 CJ est. value
Melbourne, FL 32935

Last Updated 11/04/2022 04:06 PM
Project Title

Terran Orbital Manufacturing Facility

Physical Address View project details and contacts
City, State (County) Merritt Island, FL 32953   (Brevard County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Abandoned, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $300,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 660,000-square-foot manufacturing facility at the Kennedy Space Center Launch and Landing Facility. As of November 4, 2022, this project is cancelled. Information regarding municipal approvals, the architect, general contractor and method of selection has not been disclosed. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 660,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents