Similar Projects
Last Updated | 09/12/2022 02:13 PM |
Project Title | GE Turbine Overhaul at Jones Island Water Reclamation Facility |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53207 (Milwaukee County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $980,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Perform a major overhaul on a General Electric (GE) MS5001R Gas Turbine and maintenance on the General Electric (GE) 20,650 KVA Generator. The scope of work shall include at a minimum the Major Inspection procedures outlined in the GE Industrial & Power Systems Inspection and Maintenance Instructions for MS-5001 Gas Turbines. Additional pumps, heat exchangers, and miscellaneous equipment associated with the turbine generator will also be inspected and possibly rebuilt or replaced as part of this contract. Parts and materials used for this contract shall meet or exceed OEM specifications and the work of this contract shall be completed following the instructions listed in the GE Industrial & Power Systems Inspection and Maintenance Instructions for MS-5001 Gas Turbines and other documentation included as Special Attachments to these contract documents. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |