Similar Projects
Jones Island Water Reclamation Facility Building 225 PAC Cooling Pipe Repairs
Renovation
Sub-Bidding
$250,000 CJ est. value
Milwaukee, WI 53207

Water Heater Replacements & Minor Plumbing
Term Contract
Post-Bid

District Wide Bottle Filler Stations at Central Region Locations
Alteration
Post-Bid
Milwaukee, WI

Rotary Valve #6-2, #6-3, #7-1, #7-2 & #7-3 Replacements
Results
Milwaukee, WI 53207

Student Union Renovation - MEP
Results
$28,000,000 est. value
Milwaukee, WI 53211

District Wide Bottle Filler Stations - Bid Package 2
Alteration
Post-Bid
Milwaukee, WI 53228

Plumbing Maintenance Services
Alteration
Results
Milwaukee, WI

Northwest Region Locations - Bid Package 3 - District Wide Bottle Filler Stations
Alteration
Post-Bid
Milwaukee, WI 53225

Plumbing and Steamfitter Services at WVH-UG
Term Contract
Results

Private Property Inflow And Infiltration Reduction Residential Plumbing Contractors
Term Contract
Post-Bid
Milwaukee, WI

Touchless Plumbing Retrofits
Alteration
Results
Milwaukee, WI 53207

Plumbing Services
Alteration
Post-Bid
Milwaukee, WI

Time and Material Behavioral Health Division - Plumbing
Alteration
Results
Wauwatosa, WI 53226

Private Property Inflow And Infiltration Reduction - Residential Plumbing Contractors
Term Contract
Post-Bid
Milwaukee, WI

Townhomes at Carver Park - Plumbing
Alteration
Results
Milwaukee, WI

Last Updated 09/12/2022 02:13 PM
Project Title

GE Turbine Overhaul at Jones Island Water Reclamation Facility

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53207   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $980,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Perform a major overhaul on a General Electric (GE) MS5001R Gas Turbine and maintenance on the General Electric (GE) 20,650 KVA Generator. The scope of work shall include at a minimum the Major Inspection procedures outlined in the GE Industrial & Power Systems Inspection and Maintenance Instructions for MS-5001 Gas Turbines. Additional pumps, heat exchangers, and miscellaneous equipment associated with the turbine generator will also be inspected and possibly rebuilt or replaced as part of this contract. Parts and materials used for this contract shall meet or exceed OEM specifications and the work of this contract shall be completed following the instructions listed in the GE Industrial & Power Systems Inspection and Maintenance Instructions for MS-5001 Gas Turbines and other documentation included as Special Attachments to these contract documents.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents