Similar Projects
West Henderson Parks And Recreation, Phases 2 - 5 - PR247 - City Of Henderson
New Construction, Infrastructure
Conception
$84,000,000 CJ est. value
Henderson, NV 89015

Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

Ashley Furniture Industrial Facility
New Construction, Infrastructure - 298,389 SF
Design
$32,000,000 CJ est. value
Las Vegas, NV 89148

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

The Goddard School
New Construction - 11,006 SF
Post-Bid
$2,000,000 est. value
Las Vegas, NV 89131

SE Career and Technical Academy (SECTA) Phase III Gymnasium
New Construction - 61,333 SF
Results
$23,753,080 est. value
NV

Replacement Ruby Thomas Elementary School
Renovation - 99,866 SF
Results
$31,110,000 est. value
Las Vegas, NV 89169

Inspirada Marketplace
New Construction - 39,460 SF
Construction
$10,000,000 est. value
Henderson, NV 89009

Break Masters / Henderson
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Henderson, NV 89052

Boulder Lodge Expansion
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$9,600,000 CJ est. value
Henderson, NV 89015

Dream Hotel Las Vegas
New Construction, Infrastructure - 27,000 SF
Pending Verification
$545,000,000 CJ est. value
Las Vegas, NV 89119

Charleston to Cheyenne Wideninig - Clark County
Infrastructure
Conception
$25,000,000 CJ est. value
Las Vegas, NV 89101

Aspire at Sunset
New Construction, Infrastructure
Design
$75,000,000 CJ est. value
Henderson, NV 89014

Centennial And Lamb Commercial Site Work
Alteration
Post-Bid
North Las Vegas, NV 89115

Last Updated 06/23/2023 09:32 AM
Project Title

St. Jude's Healing Center Education Building

Physical Address View project details and contacts
City, State (County) Boulder City, NV 89005   (Clark County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $5,130,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 24 the project is set to be awarded on June 8, Council Meeting . The Work consists of Construction of a 9,443 square foot school building. The school building consists of a flex room, three classrooms, open offices, restrooms, an electrical room, a telecommunications room, a storage room, a kitchen, and associated support spaces. This school building will be part of the St. Jude's Healing Center, which is also a part of the St. Jude's Ranch for Children in Boulder City, Nevada. This education building is being concurrently built with St. Jude's Healing Center. Contractor is to anticipate coordination activities with that contractor's work in performance of this work. Prequalified Bidders shall have a Nevada Contractor's License with the Classification of AB, B. Bid documents will be available online via our cloud-based site "Bluebeam" beginning Monday, April 10, 2023. Pre-Qualified Prime Bidders will need to email Arianna Molina at molinaa2@nv.ccsd.net to request the invitation for the digital bid documents through CCSD's Bluebeam document viewer tool with instruction on how to view and print the Bid documents. The Clark County School District is an equal opportunity employer and will not knowingly discriminate in any area of employment, and invites all businesses to include women-owned, minority-owned, and disadvantaged business enterprise companies to participate in our bidding process.

Details

,, 18,886 SF - 9,443 SF. 9,443 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents